Laserfiche WebLink
 Texas Department of Licenses and Regulation will inspect all newly constructed sidewalk on Park Dr.  Texas Department of Licenses and Regulation will inspect all newly constructed sidewalk <br /> on Park Dr. <br />form S. Lobit to San Jacinto and all 23 ADA ramps for compliance tolerance. This service has a total form S. Lobit to San Jacinto and all 23 ADA ramps for compliance tolerance. This <br /> service has a total <br />amount of $650.00amount of $650.00 <br /> Benefits: <br /> Sidewalk networks are an integral part of the multi Sidewalk networks are an integral part of the multi--modal system within a City to get people from point modal system within a City <br /> to get people from point <br />A to point B in a safe and walk friendly manner.  Park Dr. from S. Blackwell to Fairmount Parkway which A to point B in a safe and walk friendly manner.  Park Dr. from S. Blackwell to <br /> Fairmount Parkway which <br />serves as a direct route for pedestrians walking to and from the La Porte High School and the Sea serves as a direct route for pedestrians walking to and from the La Porte High School <br /> and the Sea <br />Breeze Park. Breeze Park.  <br /> Operating Cost:Operating Cost: <br /> Future Maintenance costs. Future Maintenance costs. <br />Action Required of Council:Action Required of Council: <br />Consider approval or other action to award Bid #17003 to G.W. Phillips for the Park Dr. Sidewalk Consider approval or other action to award Bid #17003 to G.W. Phillips for the Park Dr. <br /> Sidewalk <br />Improvements, and authorize the City Manager to enter into a construction contract in the amount of Improvements, and authorize the City Manager to enter into a construction contract <br /> in the amount of <br />$369,376.00; additional professional services contracts with RPS Klotz and Tolunay$369,376.00; additional professional services contracts with RPS Klotz and Tolunay--Wong Engineers, <br /> Wong Engineers, <br />and Texas Department of Licenses and regulation for a total amount of $11,415.00; and a construction and Texas Department of Licenses and regulation for a total amount of $11,415.00; <br /> and a construction <br />contingency of 10%, equal to $36,937 for a total project budget of $417,728.contingency of 10%, equal to $36,937 for a total project budget of $417,728. <br />Approved for City Council AgendaApproved for City Council Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />