My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-14-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2019 (2)
>
10-14-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2019 9:54:50 AM
Creation date
7/25/2025 3:27:39 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
10/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: October 14, 2019 <br />Requested By: Ray Mayo, PW Director <br />Department: Public Works <br />Report Ir' Resolution" Ordinance <br />Exhibits: Letters of agreement for the Hillridge Ground Tank <br />the Lomax Elevated Tank <br />Appropriation <br />Source of Funds: 003 — Utility Fund <br />Account Number: <br />Amount Budgeted: $300,000 / $600,000 <br />Amount Requested: $30,000 / $75,000 <br />Budgeted Item:; Yes No <br />and <br />SUMMARY <br />The City approved two CIP projects in the FY2019-20 budget: 1) Hillridge Ground Tank Replacement, and 2) <br />Coating of the Lomax Elevated Storage Tank. The Hillridge Ground Tank is 45 years old and at the end of its <br />useful life. The Lomax Elevated Tower is in need of interior coating replacement, overcoating of the exterior, and <br />some minor structural repairs. <br />Dunham Engineering was awarded an RFQ in December 2014 for City of La Porte Water Storage Consultant <br />Services. Dunham Engineering has provided inspection services, engineering, and design services for the City <br />of La Porte for over 25 years. Staff recommends approval of the two proposals for engineering and design <br />services from Dunham Engineering. <br />RECOMMENDED MOTION <br />I move that the Council authorize the City Manager to enter into <br />agreements with Dunham Engineering for the design, bid, and <br />construction phase services for the Hillridge Ground Tank <br />Replacement for $30,000 and for the Coating of Lomax Elevated <br />Storage Tank for $75,000, for a total authorization of $105,000. <br />Approved for the City Council meeting agenda <br />Corby D. Alexander, City Manager <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.