Laserfiche WebLink
College Station, TX U N H A M Phone: (979) 690.6555 <br />McAllen, TX N G I N E E R I N C Fax: (979) 690-7034 <br />Oklahoma City, OK ID TX Registrationft: F-2253 <br />INSPECT1®N.DES1GN. RESULTS. www.DunhamEngineering.corn <br />Letter of Agreement <br />This is an Agreement made as of 2019 between City of La Porte, Texas <br />hereinafter known as the OWNER and Dunham I nginecring, Inc. of College Station, 'Texas <br />hereinafter known as the I NGINI3ER. <br />The MNLR intends for the ENGINEER to perform professional engineering service in the design <br />and construction inspection of the ``YORK <br />The WORD is defined as the Rehabilitation of the Lomax Elevated Water Storage 'Tank located in La <br />Porte, Texas. <br />WORK includes replacement of interior coating system, overcoating exterior coating system and <br />:minor repairs to structure. I-'stimated contractor cost is 5500,000. <br />PHA.SIF, I- DESIGN <br />The l'NGINE'ER agrees to prepare the design, produce engineering plans and specifications, prepare <br />the contract documents, advertise For bids to selected contractors and recommend award of a lump <br />suin construction contract to complete the WORK for the OWNER. <br />The I'NGINEE'Ragrees to provide a draft set of contract documents to the OWNI R for review and <br />approval no later than 30 days from the date of the Agreement. <br />The ENGINEER agrees to finalize the documents and advertise the WORK to selected contractors for <br />bid within 30 days after receipt of OWNER'S comments and approval. <br />The 0"EIR agrees to advertise in the local newspaper of record as required. <br />The ENGINEER agrees to assist the OWN] R in opening and reviewing bids and recommending a <br />contractor for award. <br />