Laserfiche WebLink
April 22, 2020 <br />Proposal for Survey <br />Page No. 2 <br />In general, the scope for work will be including the following items and tasks: <br /> <br />Item 1: Topographic Survey: <br /> Horizontal and vertical controls will be established and tied to the Texas State Plane Coordinate <br />System, South Central Zone NAD 83 and datum NAVD 88. Survey will be tied to the City of La Porte <br />monument (if available) or nearby NGS monument. Survey will also be tied to the nearby TSARP <br />monument. <br /> Cross sections will be surveyed at every 100 feet interval along the project route. <br /> All planimetric features will be surveyed along the corridor for a width of ROW+10’. <br /> All visible existing utilities (i.e. manholes, culverts, power poles, etc.) will be located and pipe size and <br />flow line measure downs in the manholes, inlets (as available and that can be opened) will be <br />obtained. <br /> Texas one-call system will be notified, and pipeline companies will be contacted to probe and mark <br />their pipeline (if any) locations to be tied to the survey. <br /> All level A & B SUE findings (explored by SUE surveyor) will be surveyed <br /> Attempt will be made to recover and verify enough monumentation along the existing roadway to <br />establish estimated right-of-way lines for topographic surveying scope. Task of establishing estimated <br />ROW may involve some limited abstracting and deed research, however, detail boundary category <br />survey is excluded in determination. <br /> Signed and sealed field books containing notes as well as ASCII files of point numbers, coordinates, <br />and descriptions will be provided. <br /> Boreholes will be located in the field and will be shown in the AutoCAD plan drawing <br />Item 1: Basemap Plan & Profile <br /> <br /> Coordinate with private utility companies and City of La Porte for record drawings <br /> Perform utility research and delineation of underground utility lines from available record drawing and <br />surveyed information <br /> Prepare profile for ground lines corresponding to the center line of the street, center line of the <br />ditch/curb lines, right-of-way lines for the streets as shown in the attached table. <br /> Prepare profile view of existing utilities for the same streets from available record and field information <br /> All deliverables will be as long strip in the AutoCAD format with side text on the top and bottom <br />boundary of the drawing. <br /> <br />Item 3: Survey Control Map <br /> <br /> A survey control map will be prepared showing swing ties to traverse and baseline points as well as <br />TBM’s. The survey control map will be signed and sealed by a Registered Professional Land Surveyor <br />in charge of the project. <br /> <br />Item 4: Surveying SUE Findings <br /> <br /> Recover controls and reestablish as necessary <br /> Survey Level A & B SUE findings as marked by SUE Surveyor <br /> Incorporate surveyed information in the topo and utility drawing <br />To our understanding the following are excluded from the scope of this proposal <br /> Boundary level survey for determining of right of way of the street <br /> Any Level A and B SUE category survey <br /> Construction phase survey (including staking design centerline) <br /> Accessing/opening electric and communication manholes (if any) <br /> Surveying any confined space of large manhole structure (if any) <br /> Surveying main lanes of SH 146 <br /> <br />