My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-27-20 Regular Meeting of the La Porte City Council (2)
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2020
>
07-27-20 Regular Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 10:14:31 AM
Creation date
7/25/2025 3:28:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 22, 2020 <br />Proposal for Survey <br />Page No. 3 <br />ADDITIONAL SERVICES <br />Item-1: Topographic Surveying for Detention Pond <br />Topographic survey will be performed for a proposed detention pond area (size to be determined). Location of <br />the detention pond is not selected yet. Some conceptual options are shown in the attached exhibit. <br /> <br />Survey shall conform to all requirements of City of La Porte and Category 6 survey, Condition 2 of TSPS <br />Manual as applicable. In general, the scope for survey will be including the following tasks: <br /> <br />1. Horizontal and vertical controls will be established and tied to the Texas State Plane Coordinate <br />System, South Central Zone NAD 83 and datum NAVD 88. The nearby TSARP monument will also be <br />tied to the survey as benchmark. <br />2. Limited site clearing of brushes as applicable (if wooded) <br />3. Survey elevations in a 50’x50’ grid <br />4. Survey all topographic (with or without trees within wooded area) and utility features. <br />5. Prepare a plan drawing with DTM/contour in AutoCAD. <br /> <br />The deliverables will be signed and sealed topographic survey map. <br />Item-2: Boundary Surveying for Detention Pond <br />Boundary Survey will be done for the proposed detention pond area. Survey will comply with Category 1A, <br />Condition 2 survey of the latest TSPS Manual and City of La Porte survey requirements as applicable/feasible. <br />Horizontal and vertical controls will be established and tied to the Texas State Plane Coordinate System, South <br />Central Zone NAD 83 (CORS 96) and datum NAVD 88. In conformance, the scope of work will include the <br />following: <br /> <br />1. Searching and surveying monuments for establishing boundary of the site. <br />2. Abstracting and deed research for the pond site and adjoining properties. <br />3. Preparing plat map drawing for boundary of the site. <br />4. Preparing metes and bound description for the boundary of the site. <br />5. Map check closure for the boundary. <br />6. Setting the boundary on the ground. <br /> <br />The deliverables will be signed and sealed boundary plat map and metes and bounds. <br /> <br /> <br /> <br />Item-3: Channel Cross Section Survey <br />Four cross sections will be surveyed along Little Cedar Bayou in the vicinity of the detention pond area. <br />In general, the scope for survey will be including the following tasks: <br />1. Horizontal and vertical controls will be established and tied to the Texas State Plane Coordinate <br />System, South Central Zone NAD 83 and datum NAVD 88. The nearby TSARP monument will also be <br />tied to the survey as benchmark. <br />2. Limited site clearing of brushes as applicable. <br />3. Survey four channel cross sections including elevations at flowline, toe, high bank, water level, <br />estimated ROW line, etc. <br />4. Prepare a plan drawing with surveyed cross sections in AutoCAD. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.