Laserfiche WebLink
April 22, 2020 <br />Proposal for Survey <br />Page No. 4 <br />FEE AND SCHEDULE: <br />Estimated fees and schedule for the above referenced works will be as follows: <br />BASIC SERVICE: <br />Item Services Fee (lump sum)*Schedule <br />Item-1 $9,688.00 <br />Topographic Surveying <br />Item-2 <br />Basemap Plan & Profile $3,656.00 <br />4 weeks <br />Item-3 <br />Survey Control Maps $2,252.00 <br />Item-4 <br />Establishing Design Center Line$2,444.00 <br />Total (Basic Services) 4 weeks <br />$18,040.00 <br />ADDITIONAL SERVICE: <br />Item-1 Topographic Surveying for Detention Pond $2,600/acre for clear TBD <br />area <br />$4,900/acre for wooded TBD <br />area without tree survey <br />$9,450/acre for wooded TBD <br />area with tree survey <br />Item-2 Boundary Surveying for Detention Pond $3,000/acre TBD <br />Item-3 Channel Cross Section Survey (4) $1,450.00 TBD <br /> * See detail breakdown in the attached pages <br /> <br /> <br />We appreciate this opportunity to submit this proposal. If you need further information, please do <br />not hesitate to contact me. <br /> <br />Sincerely, <br /> <br /> <br />Shaheen Chowdhury, P.E., R.P.L.S. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />