My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-27-20 Regular Meeting of the La Porte City Council (2)
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2020
>
07-27-20 Regular Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 10:14:31 AM
Creation date
7/25/2025 3:28:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 22, 2020 <br />Proposal for Survey <br />Page No. 5 <br />Item 1: Level of Efforts for Topographic Survey <br />Principal RPLS SIT CADD Crew Hrs Cost <br />Survey Tasks sub tasks Total <br />$180.00 $140.00 $90.00 $81.00 $150.00 <br />Survey Controls <br />Setting controls 1 1 $150.00 <br />Tie to project benchmark 0.5 1 1.5 $195.00 <br />Horizontal control work 1 2 3 $390.00 <br />Vertical control work 1 4 5 $690.00 $1,425.00 <br />Topo Survey <br />One Call & Private utility <br /> 2 2 $180.00 <br />coordination <br />Limited Abstracting for <br /> $500.00 <br />ROW <br />Estimated ROW 3 6 4 13 $1,560.00 <br />Surveying roadway & <br /> 2 8 20 30 $3,828.00 <br />topo features <br />Borehole survey 0.5 2 2.5 $345.00 <br />Manhole inverts 1 4 5 $690.00 <br />QC/QA 4 4 8 $1,160.00 $8,263.00 <br />Project Management <br />Proj Management $0.00 $0.00 <br />Total <br /> $9,688.00 <br />Item 2: Level of Efforts for Basemap Plan & Profile <br />Principal RPLS SIT CADD Crew Hrs Cost <br />Tasks sub tasks Total <br />$180.00 $140.00 $90.00 $81.00 $150.00 <br />Plan & Profile <br />Utility research 2 2 $180.00 <br />Topo & Utility Plan 16 16 $1,296.00 <br />Ground & utility profile 16 16 $1,296.00 <br />QC/QA 4 4 8 $884.00 <br />$3,656.00 <br />item 3: Level of Efforts for Survey Control Maps <br />Principal RPLS SIT CADD Crew Hrs Cost <br />Survey Tasks sub tasks Total <br />$180.00 $140.00 $90.00 $81.00 $150.00 <br />Survey Control Map Preparing Survey <br /> 4 8 12 24 $2,252.00 $2,252.00 <br />control map <br />Item 4: Level of Efforts for Surveying SUE Findings <br />Principal RPLS SIT CADD Crew Hrs Cost <br />Survey Tasks sub tasks Total <br />$180.00 $140.00 $90.00 $81.00 $150.00 <br />Recover/establish survey <br /> 2 4 6 $780.00 <br />Establish design <br />controls <br />center line <br />Survey SUE findings 1 4 8 13 $1,664.00 <br />$2,444.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.