Laserfiche WebLink
2018 IFC Update <br />2018 IFC Chapter 33: Fire Safety During Construction and Demolition <br />Code Section <br />Section Title Description of Change <br />2018 2015 <br />3304.5,3304.5, <br />Fire Watch Criteria for requiring fire watch has been added to the code along with <br />3308, 3309.1 3308, <br />Duringclarification to the functions and duties of the fire watch personnel. <br />3309.1 <br />Modification <br />Construction and <br />Demolition <br />2018 IFC Chapter 38: Higher Education Laboratories <br />Code Section <br />Section Title Description of Change <br />2018 2015 <br />Chapter 38 <br />Outdoor A new chapter has been added to the IFC to specifically regulate college <br />Addition <br />Assembly Events and university laboratories. Correlating sections have been added to a new <br />Section 427 in the IBC. <br />2018 IFC Chapter 39: Processing and Extraction Facilities <br />Code Section <br />Section Title Description of Change <br />2018 2015 <br />Chapter 39 <br />Plant Processing A new chapter has been added to the IFC to specifically regulate the <br />Addition <br />and Oil Extraction process of extracting oils from plant material. <br />Facilities <br />2018 IFC Chapter 50: Hazardous Materials—General Provisions <br />Code Section <br />Section Title Description of Change <br />2018 2015 <br />Table <br />Table <br />Consumer Addresses the explosive nature of Division 1.4G explosives and removes <br />5003.1.1,5003.1.1, <br />Fireworks the 100% increase credit for sprinklers where these items are stored. <br />Section 202 Section 202 <br />Modification <br />Table <br />Table <br />MaximumThe maximum allowable quantity for Class 3 oxidizers is increased by about <br />5003.1.1(1), 5003.1.1(1), <br />Allowable 10 percent in control areas and Groups M and S occupancies. <br />TableTable <br />Quantity for <br />5003.11.1,5003.11.1, <br />Class 3 Oxidizers <br />SectionSection <br />6303.1.1.26303.1.1.2 <br />Modification <br />5003.8.3.45003.8.3.4 <br />Includes Type IV construction in control area fire resistance rating <br />Control Area <br />Modification <br />requirements. <br />Construction <br />5005.1.12 5005.1.12 <br />Protection of Requirements for leak detection and emergency shutoff for high hazard <br />Hazardous gases and liquids only applies when the maximum allowable quantity per <br />Modification <br />Materials Piping control area is exceeded. <br />Systems <br />0 ¦¤ΐΑ <br /> <br />