Laserfiche WebLink
<br /> <br />Figure: Dispatch Center Solution Rack Diagram <br />1.8 CUTOVER <br />This section provides a high level plan of the cutover: <br /> Motorola shall install and configure the 1 rack of equipment. <br /> Motorola shall decommission existing console and install 4 MCC7500E consoles. <br /> Motorola to interface the existing eight control stations to the proposed CCGW. <br />(Motorola assumes the Ethernet link is available and functional prior to installation). <br />A detailed cutover process will be discussed with City of La Porte during the DDR process. It shall outline <br />the requirements and steps that will be taken during the cutover process to ensure minimal interruption of <br />service. <br />City of La Porte May 2020September 26, 2017 <br />IP Base Console Upgrade Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br /> Motorola Solutions Confidential Restricted Table of Contents 1-vii <br /> <br />