My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-12-20 Regular Meeting of the La Porte City Council (2)
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2020
>
10-12-20 Regular Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 9:08:03 AM
Creation date
7/25/2025 3:29:16 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
10/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.9 POWER REQUIREMENTS <br />City of La Porte will provide power, backup power (UPS and/or Generator), HVAC at the dispatch location. <br />Any electrical upgrades to support the proposed equipment will be provided by the customer. Additionally, <br /> <br />The customer will provide two 60A electrical feeds to the proposed AC Edge power distribution unit at the <br />dispatch location. The customer will provide necessary Type 1 and Type 2 surge protection devices at the <br />dispatch location. <br />The Electrical and Heating, Ventilation, and Air Conditioning (HVAC) load requirements for the proposed <br />radio system are listed below. <br />Total Total Total <br />System Components Qty WATTS BTU Amps <br />5źƭƦğƷĭŷ <br />Site Controller 1 125 428 1.1 <br />Site Gateway 1 114 390 1.0 <br />LAN Switch 1 182 622 1.6 <br />CCGW 1 184 612 1.5 <br />Z2 Workstation 4 800 2160 7.6 <br />22 inch Monitors, Touch 4 624 4046 5.2 <br />TOTAL: 2029 8258 18 <br />1.10 DESIGN ASSUMPTIONS <br />Motorola has based the system design on information gathered from meeting with the City. All assumptions <br />t or not agreeable to <br />the City, a revised proposal with the necessary changes and adjusted costs may be required. Changes to the <br />equipment or scope of the project after contract may require a change order <br /> Motorola has based the design on the ASTRO Master Site must be at <br />R7.17.2 when implementing the proposed solution. <br /> Motorola assumes the core can accommodate the new site. The core router was not included as part of the <br />quote. If a new core router is required, a change order may be required. <br /> Motorola will not run any RF analysis for the existing radios as part of this proposal. <br /> Customer will be responsible to provide Ethernet Master Site. <br /> No logging recorder or an interfacing equipment is included as part of the proposal. Existing Eventide <br />analog logging recorder will be used to record the analog 2W audio from the existing control stations. <br /> <br /> No Subscribers or subscriber programming is included in the proposal. <br /> Motorola assumes that the customer provided link shall be copper demark. In the event a fiber link is <br />provided, a change order for additional hardware will be required. <br /> No KVL is included as part of the proposal. Customer provided KVL will be used to load the proposed <br />encryption. <br /> Customer will provide space for the installation of the MCC 7500E console positions and backroom <br />equipment as outlined in this proposal <br /> All existing sites or equipment locations will have sufficient space available for the system described. <br />City of La Porte May 2020September 26, 2017 <br />IP Base Console Upgrade Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br /> Motorola Solutions Confidential Restricted Table of Contents 1-viii <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.