Laserfiche WebLink
<br /> All existing sites or equipment locations will have adequate electrical power and site grounding (per R56) <br />to support the requirements of the system described. Any R- <br /> Customer will be responsible to provid <br />requirements specified in this proposal. The addition of electrical circuits at the various sites to support <br />the proposed system is the responsibility of the customer. <br /> Any site/location upgrades or modifications are the responsibility of the Customer. Structural upgrades <br />and/or modifications to any existing building or towers are not included. Customer is responsible for all <br />civil work required for this project. <br /> Any tower stress analysis or tower upgrade requirements are the responsibility of the customer <br /> The customer is responsible for providing a 20A Quad Outlet within 6ft of the dispatch console position <br />equipment. <br /> Motorola is not responsible for interference caused or received by the Motorola provided equipment <br />except for interference that is directly caused by the Motorola provided transmitter(s) to the Motorola <br />investigate the source and recommend solutions to mitigate the issue. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION 2 <br />City of La Porte May 2020September 26, 2017 <br />IP Base Console Upgrade Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br /> Motorola Solutions Confidential Restricted Table of Contents 2-ix <br /> <br />