Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:October 11, 2021 <br />Requested By:Ray Mayo, Director Source of Funds:N/A <br />Department:Public Works <br />Account Number:N/A <br />Amount Budgeted:N/A <br />ReportResolutionOrdinance <br />Amount Requested:N/A <br />Exhibits:Area Map; Harris County Partnership <br />Budgeted Item:YesNo <br />Project Guideline; Inter-local Agreement <br />SUMMARY& RECOMMENDATION <br />The Bayside Terrace Subdivision Drainage Improvements Project was the second <br />highest prioritized drainage project by the Drainage Committee at the August 13, 2018 <br />Drainage Committee meeting. According to a drainage study conducted by Klotz <br />Associates in 2009, the existing Bayside Terrace Subdivision was identified as having <br />3-year Level of Service (LOS), using old rainfall data. The existing drainage system <br />consists of roadside ditches and underground reinforced concrete pipe ranging in size <br />from 12-inch to42-inch. Halff Associates, Inc. (Halff) was commissioned, in 2020, to <br />evaluate the existing drainage conditions within the subdivision and to provide <br />recommended drainage improvements to accommodate a 100-year rain event. Halff <br />has completed approximately90% of the final design of the proposed project, providing <br />an opinion of probable construction cost of $6,947,215.00. Funding for the Bayside <br />Terrace Subdivision Drainage Improvements Project has been allocated within the <br />budgets for a total current project allocation of <br />$5,405,000.00. <br />On December 31, 2020,Harris County Precinct 2 began accepting applications for <br />potential Capital Improvement Projects (CIP) and maintenance projects to be funded in <br />partnership with other area agencies to serve the citizens of Harris County. The <br />program provides funding for study, final design, right-of-way acquisition and <br />construction of capital and maintenance projects. City staff submitted the Bayside <br />Terrace project to Harris County for consideration, and received confirmation that Harris <br />County selected the project to receive partnership funds. As outlined in the terms of the <br />attached proposed inter-local agreement (ILA), Harris County would provide funding for <br />50% of all drainage related components of the project. The total anticipated project cost <br />of $7,336,458.75is ascribed to: $6,945,172.30 construction costs (including a 10% <br />contingency); $252,383.00 engineering costs; $138,903.45 material testing costs. Each <br />of the respective costs will be split between the City and County 60/40; 100/0; and <br />50/50, respectively. The non-50/50 splits are due to the inclusion of non-drainage <br />related components within the costs. The City of La Porte had entered into professional <br /> <br />