My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11-21 Regular Meeting
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
10-11-21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 12:52:00 AM
Creation date
7/25/2025 3:31:46 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
10/11/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Has documented flooding of structures, vehicular or pedestrian crash related incident occurred <br />that would be prevented or lessened in the future by the project? <br /> <br />C.Infrastructure Condition (20 Points) <br /> <br /> Condition of existing infrastructure requiring maintenance should include visual aids to support <br />your application. <br /> <br />D. Project Area (15 Points) <br /> <br />Characteristics of the geographic area of the proposed project. The submittal should answer these <br />questions: <br /> What current population would directly and indirectly benefit from the project? <br /> What is the age of area development and how long has the problem existed? <br /> What is the number of benefitted public buildings (schools, libraries, churches, etc.)? <br /> What amount of infrastructure (roads, drainage/flood control, etc.) would be repaired? <br /> <br />E. Level of Partner Participation, Funding Commitment and Agency Priority (25 Points) <br /> <br /> Proposed cost-share contribution by the submitting agency or other agencies. Harris County <br />Precinct 2 typically requires a fifty-percent cost share contribution from its partners. Preference <br />is given to projects with maximum external agency participation. <br /> <br /> Rank in priority A <br />number of integrated projects required to improve a particular asset may be consolidated <br />and classified as a single, phased project. <br /> <br /> Demonstration of financial commitment and timing to the project. The submittal should <br />answer some or all these questions: <br /> <br />(1) Is the agency ready to fund and implement the project and enter into an <br />Intergovernmental Agreement? <br /> <br />(2) Is the project a part of or consistent with an articulated, short or long-range maintenance <br />the component of the plan indicating the project should be included in the submittal. <br /> <br />(3) Does the project have a current schedule of funding, implementation, including <br />anticipated milestones and deliverables? <br /> <br />F. Operations and Maintenance Costs to Harris County (15 Points) <br /> <br />Total operations and maintenance costs Ʒƚ ĬĻ ĬƚƩƓĻ ĬǤ ƷŷĻ /ƚǒƓƷǤ. Maximum ratings are assigned to <br />requests with minimal operations and maintenance costs to be borne by the County or HCFCD. <br /> ¯¦ȁ Ζ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.