Laserfiche WebLink
Abandon existing lift station and convert wet well to sanitary <br />sewer manhole, including salvage of existing equipment, Filling <br />8 <br />lift station bottom with grout to lowest invert level, connecting <br />EA. <br />3 <br />$20,000.00 <br />$60,000 <br />new sanitary sewer lateral into manhole, and precast concrete <br />transition slab with new manhole lid, ring, cover, and cone <br />section, complete in place, the sum of: <br />Remove existing sanitary sewer force main, all sizes and <br />L.F. <br />3,1D0 <br />$17.00 <br />$52,700 <br />depths, complete in lace, the sum of: <br />10 <br />Cut, plug, and abandon existing sanitary sewer Force main, <br />EA. <br />13 <br />$500.00 <br />$6,500 <br />complete in place, the sum of: <br />11 <br />12" C900 PVC san swr force main, complete in place, the sum <br />L. F <br />8,100 <br />$150.00 <br />$1,215,000 <br />0 <br />12 <br />1complete <br />12" C900 PVC san swr force main w120" steel casing (Auger), <br />L. F <br />200 <br />$250.00 <br />$50,000 <br />in place, the sum of: <br />13 <br />Connect 12" C900 PVC san swr force main to existing <br />EA. <br />1 <br />$14,000.00 <br />$14,000 <br />manhole, complete in place, the sum of: <br />14 lAir <br />Release Valve Manhole, complete in place, the sum of: <br />EA. <br />10 <br />$5,000.00 <br />$50,000 <br />15 <br />6" C900 PVC san swr force main (Auger), complete in place, <br />L.F. <br />530 <br />$50.00 <br />$26,500 <br />the sum of: <br />16 <br />8" C900 PVC san swr force main (Auger), complete in place, <br />L.F. <br />1,350 <br />$75.00 <br />$101,250 <br />the sum of: <br />Remove and replace 4" thick reinforced concrete <br />17 <br />sidewalk/walkway, all widths, with compact subgrade, <br />S.F. <br />300 <br />$10.00 <br />$3,000 <br />,complete in place, the sum of: <br />18 <br />Remove and dispose wooden pedestrian bridge, complete in <br />EA. <br />1 <br />$1,500.00 <br />$1,500 <br />lace, the sum of: <br />19 <br />Remove and replace chain link fence, complete in place, the <br />L.F. <br />30 <br />$40.00 <br />$1,200 <br />sum of: <br />Remove and replace existing sidewalk curb ramp in <br />20 <br />conformance with ADA standards, complete in place, the sum <br />EA. <br />1 <br />$2,000,00 <br />$2,000 <br />of: <br />Connect proposed 12-inch sanitary sewer force main to <br />21 <br />proposed 8-inch force main from Lift Station 10, complete in <br />EA. <br />1 <br />$14,000.00 <br />$14,000 <br />lace, the sum of: <br />22 <br />Connect proposed sanitary sewer force main to existing force <br />EA. <br />1 <br />$1,500.00 <br />$1,500 <br />main at Lift Station 26, complete in place, the sum of: <br />Lift Station and Force Main Items Total: <br />$3 481 150 <br />SANITARY SEWER BID ITEMS: <br />23 <br />Remove existing sanitary sewer gravity main, all sizes and <br />L.F. <br />20,000 <br />$17.00 <br />$340,000 <br />depths, complete in place, the sum of: <br />24 <br />Remove existing sanitary manhole, complete in place, the sum <br />EA. <br />67 <br />$550.00 <br />$38,850 <br />o <br />25 <br />12" PVC sanitary sewer pipe ASTM D3034 SDR26, all depths <br />L.F. <br />3,550 <br />$95.00 <br />$337,250 <br />(Open Cut), complete in place, the sum of: <br />26 <br />12" PVC sanitary sewer pipe ASTM D3034 SDR26 w120" Steel <br />L,F, <br />35D <br />$300.00 <br />$105,000 <br />Casing, all depths (Auger), complete in place, the sum of: <br />27 <br />115" PVC sanitary sewer pipe ASTM D3034 SDR26, all depths <br />L. F <br />3 120 <br />$105 00 <br />$327,600 <br />(Open Cut), complete in place, the sum of: <br />28 <br />18" PVC sanitary sewer pipe ASTM F679 PS115, all depths <br />I(Open <br />L. F. <br />8,100 <br />$115.00 <br />$931,500 <br />Cut), complete in place, the sum of: <br />29 <br />18" PVC sanitary sewer pipe ASTM F679 PSI 15 w130" Steel <br />L. F <br />640 <br />$450.00 <br />$288,000 <br />Casing, all depths (Auger), complete in place, the sum of: <br />30 <br />21" PVC sanitary sewer pipe ASTM F679 PSI 15, all depths <br />L. F. <br />1 5,200 <br />$135.00 <br />$702,000 <br />(Open Cut), complete in place, the sum of: <br />