My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-30-06 Special Called City Council Retreat Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2000's
>
2006
>
01-30-06 Special Called City Council Retreat Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2022 3:56:38 PM
Creation date
7/29/2025 2:22:13 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda
Date
1/30/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />• CAPITAL IMPROVEMENT PROJECT COST ESTIMATE FORM <br />Project Number: PM2005 1 Departmental Ranking: 1 <br />Project Name: City Wide Wheel Chair Ramp & In -fill Sidewalk Construction <br />Responsible Department: Planning <br />TYPE OF COST: PROJECT SCHEDULE: <br />Land: Planning: yrs. mos. <br />Design & Consulting: $ 3,000 Design: yrs. 3 mos. <br />Construction: S 491000 Engineering: yrs. mos. <br />Furnishings or Equip: Land/ROW Acq.: yrs. mos. <br />Other Construction Letting: yrs. 3 mos. <br />Contingency: $ 5,000 Construction: yrs. 2 mos. <br />Total project estimate: $ 50,000 Total time to complete: yrs. 8 mos. <br />• DOES THIS COST ESTIMATE OR SCHEDULE ANTICIPATE USE OF CITY FORCES TO <br />COMPLETE THE PROJECT? (DESCRIBE): <br />No <br />ANNUAL IMPACT ON CITY OPERATIONAL COSTS (DESCRIBE): <br />None <br />Total estimated Annual Impact on City Operating Cost None <br />0 Attach additional sheets if needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.