Laserfiche WebLink
EXIMIT A <br />• CAPITAL 1WROVEMENT PROJECT COST ESTIMATE FORM <br />Project Number: 2005/6-2 Departmental Ranking: 2 <br />Project Name: 12" Water Main In -Fill Miller Cut Off <br />Responsible Department: Planning <br />TYPE OF COST: <br />PROJECT SCHEDULE: <br />Land: <br />Planning: <br />yrs. <br />mos. <br />Design & Consulting: $12,974 <br />Design: <br />yrs. <br />3 <br />mos. <br />Construction: $»Q 235 <br />Engineering: <br />yrs. <br />2 <br />mos. <br />Furnishings or Equip: <br />Land/ROW Acq.: <br />yrs. <br />mos. <br />Other <br />Construction Letting: <br />yrs. <br />2 <br />mos. <br />Contingency: $19,460 <br />Construction: <br />yrs. <br />3 <br />mos. <br />Total project estimate: $162,169 <br />Total time to complete: <br />yrs. <br />10 <br />mos. <br />• <br />DOES THIS COST ESTIMATE OR SCHEDULE <br />ANTICIPATE USE OF CITY FORCES TO <br />COMPLETE THE PROJECT? (DESCRIBE): <br />In -House survey and drafting <br />ANNUAL IMPACT ON CITY OPERATIONAL COSTS (DESCRIBE): <br />Time to exercise valves and flush hydrants <br />Total estimated Annual Impact on City Operating Cost NONE <br />• Attach additional sheets if needed. <br />