My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-21-2002 Committee Meeting
LaPorte
>
.Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2002
>
08-21-2002 Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:05:56 AM
Creation date
7/31/2025 10:27:05 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
8/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a k S ao (:�_"irj) <br />Port of Houston Authority <br />Wetland Mitigation Plan <br />Scheduled monitoring events include: <br />45 days post -planting <br />The first scheduled monitoring event will be conducted within 45 days of the initiation of <br />Phase I. The first inspection will focus principally on the survival of planted vegetation. <br />Characteristics to be monitored; <br />• Plant survival — emergent and transitional plants (quantitative) <br />End of the 1st Growing Season <br />The second monitoring event will be conducted in the fall, at the end of the first growing <br />season. This inspection will focus on the growth of planted vegetation, growth of <br />undesirable species, and the integrity of constructed levees. Wildlife utilization will be <br />noted during the inspection(s) will be documented. <br />Characteristics to be monitored; <br />• Plant survival — emergent, transitional, and upland (quantitative) <br />• Foliar aerial coverage (quantitative) <br />• Growth of invasive undesirable vegetation (quantitative) <br />• Levee integrity (qualitative) <br />• Wildlife utilization (qualitative) <br />• Aerial photograph (quantitative) <br />Beginning of the 2"d Growing Season <br />Monitoring events will -be conducted in spring and fall, to correspond with the beginning <br />and end of the growing season. Semi-annual inspections will be conducted until Phase I <br />Performance Standards have been achieved <br />Characteristics to be monitored; <br />• Foliar aerial coverage (quantitative) <br />• Growth of invasive undesirable vegetation (quantitative) <br />• Levee integrity (qualitative) <br />• Wildlife utilization (qualitative) <br />End of Phase I <br />When PHA determines that the marsh has met the Performance Standards, a final <br />monitoring inspection will be scheduled and conducted to document conditions in the <br />wetland and demonstrate that Performance Standards have been achieved. Results of <br />the inspection will be submitted for USACE review yam). If USACE concurs with <br />the findings, Phase I monitoring will be concluded. <br />Benchmark Ecological Services, Inc. June 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.