My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-21-2002 Committee Meeting
LaPorte
>
.Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2002
>
08-21-2002 Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:05:56 AM
Creation date
7/31/2025 10:27:05 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
8/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
--I-1sac) �3'94) <br />Port of Houston Authority <br />Wetland Mitigation Plan <br />Characteristics to be monitored; <br />• Foliar aerial coverage (quantitative) <br />• Growth of invasive undesirable vegetation (quantitative) <br />• Levee integrity (qualitative) <br />• Wildlife utilization (qualitative) <br />• Aerial photograph (quantitative) <br />Phase II monitoring <br />Phase II will commence immediately after Phase I is concluded. The objective for Phase II will <br />be to document the performance of the wetland to ensure that the standards are maintained <br />over a two-year period. During Phase ll, the marsh will be monitored annually, at the end of the <br />growing season. If Performance Criteria are maintained at the conclusion of Phase II, the marsh <br />project will be certified as complete. <br />End of the Vt Phase II Growing Season <br />The first Phase II monitoring event will be conducted at the end of the first Phase II <br />growing season. The monitoring will be a quantitative inspection, similar to the <br />inspection conducted at the end of Phase I, to document maintenance of performance <br />standards. <br />Characteristics to be monitored; <br />• Foliar aerial coverage (quantitative) <br />• Growth of invasive undesirable vegetation (quantitative) <br />• Levee integrity (qualitative) <br />• Wildlife utilization (qualitative) <br />• Aerial photograph (quantitative) <br />End of the 2"d Phase II Growing Season <br />The second Phase II monitoring event will be a quantitative inspection similar to the first <br />Phase II inspection. If performance standards have been maintained at the end of the <br />second Phase II Monitoring event (2 years after performance standards were met) the <br />monitoring report will serve as the final Phase II report. <br />Characteristics to be monitored; <br />• Foliar aerial coverage (quantitative) <br />• Growth of invasive undesirable vegetation (quantitative) <br />• Levee integrity (qualitative) <br />Benchmark Ecological Services, Inc. <br />June 2002 <br />-:� `l 04- S 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.