My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-29-2003 Bayport Expansion Review Committee Meeting
LaPorte
>
.Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2003
>
05-29-2003 Bayport Expansion Review Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 5:23:42 PM
Creation date
7/31/2025 10:27:08 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
5/29/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Port of Houston Authority <br />Wetland Mitigation Plan <br /> <br />Port of Houston Authority No. 21520(Revised) <br />.alveston Bay, along the Bayport. Channel, <br />~ity of Pasadena, Harris County, ~as. <br />Attachment 1, Sheet 15 of .3'\. (Revised May 2003) <br /> <br />. <br /> <br />wetland and demonstrate that Performance Standards have been achieved. Results of <br />the inspection will be submitted for USACE review. If USACE concurs with the findings, <br />Phase I monitoring will be concluded. <br /> <br />Characteristics to be monitored; <br />o Foliar aerial coverage (quantitative) <br />o Growth of invasive undesirable vegetation (quantitative) <br />o levee integrity (qua"litative) <br />o Wildlife utilization (qualitative) <br />o Aerial photograph (quantitative) <br /> <br />Phase II monitoring <br /> <br />Phase " will commence immediately after Phase I is concluded. The objective for Phase " will <br />be to document the performance of the wetland to ensure that the standards are maintained <br />over a two-year period. During Phase II, the marsh will be monitored annually, at the end of the <br />growing season. If Performance Criteria are maintained at the conclusion of Phase II, the marsh <br />project will be certified as complete. <br /> <br />. End of the 1 st Phase II Growing Season <br /> <br />The first Phase II monitoring event will be conducted at the end of the first Phase " <br />growing season. The monitoring will be a quantitative inspection, similar to the <br />inspection conducted at the end of Phase I, to document maintenance of performance <br />standards. <br /> <br />Characteristics to be monitored; <br />· Foliar aerial coverage (quantitative) <br />· Growth of invasive undesirable vegetation (quantitative) <br />. levee integrity (qualitative) <br />· Wildlife utilization (qualitative) <br />· Aerial photograph (quantitative) <br /> <br />End of the 2nd Phase II Growing Season <br /> <br />The second Phase " monitoring event will be a quantitative inspection similar to the first <br />Phase " inspection. If performance standards have been maintained at the end of the <br />second Phase " Monitoring event (2 years after performance standards were met) the <br />monitoring report will serve as the final Phase " report. <br /> <br />. <br /> <br />Benchmark Ecological Services, Inc. <br /> <br />May 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.