My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-02-02 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-02-02 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
7/31/2025 10:32:36 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/2/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~.., b~ <br />BUSCH, HUT'CHISON & ASSOCIA`T'ES, 1NC: CON9UL71t~D=NOIN==R3 <br />~~ . 110`7 FLCETWOOD DRIV[ •-- BAYTOY~N, 7E%Ati 7720 -- PHONE (713j ~t22.021>l <br />~; ~ January 20; 1976 <br />ESTIMATE NUMBER:- One {1) -January 5, 1976 through January 20, 1976 <br />PROJECT: Cit of La Porte - Farrin ton b Collin swood 4tater Main -Job No. 75-1265 <br />•: R. Q s ap onstruction Co., Inc. <br />{` CONTRACTOR: and R. T. Bishop, A Joint Venture, P. 0. Box 961, Baytown, Texas 77520 <br />AMOUNT OF COt1TRACT: X42,011.17 CONSTRUCTION TIidE: 45 Working Days <br />,~ <br />.} _ <br />•:, ~. <br />,. <br />F' <br />~f <br />7. <br />i4 <br />:: <br />y. <br />~H <br />~4 <br />:, <br />i <br />Item <br />fio. '~ <br />Item uantit <br />Q Y Unit Unit Price Total <br /> <br />1. 12" Class 150 Asbestos-Cement <br /> tdater Line, Open Trench Con- <br />struction, Bank Sand Backfill, <br />Com late in lace <br />. <br />875 <br /> <br />L.f+. <br /> <br />13.14 <br /> <br />11,497.50 <br /> <br />2. 12" Class 150 Asbestos-Cement <br /> Water Line, Angered Construe-• <br />lion, Com late in lace <br />200 <br />L.F. <br />~ 24.95 <br />4,990.00 <br />3. 12" 90° C.I. Bend, <br />Com late in lace ' <br />- 0 - <br />Each <br />178.64 <br />- 0 - <br /> <br />4. 12" x 12" x 12" C.I. Tee, <br />Com late in lace <br />- 0 - <br />Each <br />265.27 _ 0 _ <br /> <br />5. 12" x 12" x 6" C.I. Tee, <br />Com late in lace <br />6 <br />Each <br />219.76 1,318.56 <br /> <br />6. 12" Gate Valve w/Valve Box, ~ <br />Com late in lace ~ <br />1 <br />Each <br />520.76 520.76 <br /> <br />7. 6" Gate Valve w/Valve Box, ~ <br />Com late in lace <br />- 0 - <br />Each <br />325.57 ~ _ ~ _ <br /> <br />8. Fire Hydrant, 4' Bury, with <br /> "Hydrolok" Connector, <br />Com late in lace - ~ ~ <br />0 - <br />Each <br />540.01 <br />- 0 -•• <br /> <br />9. 12" x 12" x 12" Tapping <br />Sleeve and Valve w/Valve Box, <br />Com late in .lace ~ <br /> <br />1 ~ <br /> <br />Each <br /> <br />t 314.25 <br /> <br />1,314.25 <br /> <br />10. 12" x 8" C.I.~Cross, <br />Com late in lace <br />- 0 - <br />Each <br />247.20 <br />- 0 <br />• <br />} <br />
The URL can be used to link to this page
Your browser does not support the video tag.