Laserfiche WebLink
., •. • <br />.~ <br />` ~~~`c <br />Page Two - City of La Porte -Farrington &JoblNo~g75~1265ateEstimate 1~ <br />.: • R. T. Bishop. Construction Co , <br />3 <br /> <br />Item <br />No. ti, <br />~- <br />Item <br /> <br />uantit <br /> <br />Unit <br /> <br />Unit Price <br />- <br />Total <br />11. 12" x 8" A.C. Reducer, `- 0 - <br /> Com fete in lace _ 0 - Each 120.59 <br /> <br />12. 8" x 4" A.C. Reducer, <br />Com lete in• lace <br />- 0 - <br />Each <br />76.51 <br />- 0 - <br /> <br />13. 6" C.I./A.C. Adapter, - 0 - <br /> Com lete in lace ~ - 0 - Each 36.00 <br /> <br />14. 4" C.I./A.C. Adapter, <br />- ~ " <br /> Com lete in lace - 0 - Each 30.00 <br /> <br />15. i2" Plug, Complete in"~ _ 0 _ <br /> lace ~ - 0 - Each .191.80 <br /> <br />16. Timber Ordered left in <br /> Trench by Engineer, 1000 <br />- 0 <br /> Com lete in lace - 0 - BdFt 10.00 <br /> <br />i7. Service taps, including brass <br /> saddle, stop and tubing . <br /> (cop er or 160 psi polyethe- <br /> lene~, Hays, P9ueller, or <br /> equal, canpression fittings, _ 0 _ <br /> Com lete in lace - 0 - Each 132.04 <br /> <br />• ~ TOTAL l,ORK COhiPLETED $19,641.07 <br />. Material On Hand <br />By Invoice Amount - Pipe & Fittings • <br />TOTAL WORK AND MATERIAL ON HAND <br />7,817.49 <br />$27,458.56 <br />