Laserfiche WebLink
. it <br />BUSCH, HUTCHISON & ASSOCIATES, 1NC. GONSULTIt/O[NOfNEERf <br />~- 1107 FLEETWOOD DRIVC BAY7OWN TCXA1! 77520 PH.~N[ 1718/ ~« o2f3 <br />• October 18, 1976 <br />ESTIMATE NUh1BER: - Se tember 15 1976 throw h October 15 1976 <br />ECT: City of La Porte.- Construction of Fairmont Park Recreational Facilities Pao 74-115 <br />Paa~ <br />CONTRACTOR: Chatham Construction Company, 1309 Jefferson, Baytown, Texas 7.7520 <br />At•1pUNT OF CONTRACT: $213,869.04 <br /> <br />i' <br />CONSTRUCTION TIME: 120 4lorking Days <br />~o, Item uanti~t Unit Unit Price Total <br />1. ConcessionjScorekeeper/Rest- <br /> room Building, including site <br /> preparation, slab, plumbing, <br /> ,f lx ures, toilet partitions, <br /> cabinets, signs, concrete <br />• -~ walk, painting, Complete i;n <br />95% Lump <br />Sum 26,200.00 24,890.00 <br /> lace <br /> <br />2. Ballfields, ~,ncluding 100 <br /> C.Y`. t'nfleld fill, final <br /> dressing, preparation for ' <br /> seeding, seeding, concrete <br /> .dugout, pads, benches and <br />roofs,-Com lets i'n dace <br />- 0 - <br />Each 3,557.00 - D - <br />3. Backstops as shown on the <br />Drawin Com lets in lace <br />- 0 - <br />Each 1,892,00 - 0 - <br /> <br />4. Ballfield Fence, 6' High, <br />~ 4 <br />30 ~ - 0 - <br /> in lace <br />l <br />t - <br />0 - L.F. . <br /> s <br />e <br />Com <br />5. Ballfield Fence, 10' High, ~ 7 <br />75 - 0 - <br /> Com lets in lace - 0 - L.F. . <br />6. Ballfield Fence, 15' Nigh, <br />0 10.19 - 0 - <br /> Com lets in lace - <br />- L.F. <br /> <br />7. Gate,~3', Complete in <br />- 0 - <br />Each 152.25 - 0 - <br /> lace <br /> <br />8. Gate, 15' Double, Complete <br />- 0 - <br />Each 275.73 - 0 - <br /> in lace <br /> <br />9. Electrical, including, <br /> ~•ri re conduit, fittings , ~ .~. <br /> fixtures, poles, switch- '.t <br /> gear, service to building, .~ <br /> coi~~plete in place <br />BASE BID uartz Li hts <br />95% Lump <br />Sum 69,780.00 66,291.00 <br />