. it
<br />BUSCH, HUTCHISON & ASSOCIATES, 1NC. GONSULTIt/O[NOfNEERf
<br />~- 1107 FLEETWOOD DRIVC BAY7OWN TCXA1! 77520 PH.~N[ 1718/ ~« o2f3
<br />• October 18, 1976
<br />ESTIMATE NUh1BER: - Se tember 15 1976 throw h October 15 1976
<br />ECT: City of La Porte.- Construction of Fairmont Park Recreational Facilities Pao 74-115
<br />Paa~
<br />CONTRACTOR: Chatham Construction Company, 1309 Jefferson, Baytown, Texas 7.7520
<br />At•1pUNT OF CONTRACT: $213,869.04
<br />
<br />i'
<br />CONSTRUCTION TIME: 120 4lorking Days
<br />~o, Item uanti~t Unit Unit Price Total
<br />1. ConcessionjScorekeeper/Rest-
<br /> room Building, including site
<br /> preparation, slab, plumbing,
<br /> ,f lx ures, toilet partitions,
<br /> cabinets, signs, concrete
<br />• -~ walk, painting, Complete i;n
<br />95% Lump
<br />Sum 26,200.00 24,890.00
<br /> lace
<br />
<br />2. Ballfields, ~,ncluding 100
<br /> C.Y`. t'nfleld fill, final
<br /> dressing, preparation for '
<br /> seeding, seeding, concrete
<br /> .dugout, pads, benches and
<br />roofs,-Com lets i'n dace
<br />- 0 -
<br />Each 3,557.00 - D -
<br />3. Backstops as shown on the
<br />Drawin Com lets in lace
<br />- 0 -
<br />Each 1,892,00 - 0 -
<br />
<br />4. Ballfield Fence, 6' High,
<br />~ 4
<br />30 ~ - 0 -
<br /> in lace
<br />l
<br />t -
<br />0 - L.F. .
<br /> s
<br />e
<br />Com
<br />5. Ballfield Fence, 10' High, ~ 7
<br />75 - 0 -
<br /> Com lets in lace - 0 - L.F. .
<br />6. Ballfield Fence, 15' Nigh,
<br />0 10.19 - 0 -
<br /> Com lets in lace -
<br />- L.F.
<br />
<br />7. Gate,~3', Complete in
<br />- 0 -
<br />Each 152.25 - 0 -
<br /> lace
<br />
<br />8. Gate, 15' Double, Complete
<br />- 0 -
<br />Each 275.73 - 0 -
<br /> in lace
<br />
<br />9. Electrical, including,
<br /> ~•ri re conduit, fittings , ~ .~.
<br /> fixtures, poles, switch- '.t
<br /> gear, service to building, .~
<br /> coi~~plete in place
<br />BASE BID uartz Li hts
<br />95% Lump
<br />Sum 69,780.00 66,291.00
<br />
|