Laserfiche WebLink
,Page:Two - City of La P~e - Construction of Fairmont ~k Recreational Facilities <br />Chatham Construction Comp - Estimate ~~o. 3 <br />' No. Item uantit Unit Unit Price .Total <br />10. Water Service, 2" PVC <br /> Pipe and Tap to main, <br /> Com lete in lace 0 L.F. 1.58 616.20 <br />11. Sanitary Sewer Service, . <br /> 6" PVC Pipe_and Manhole Tap <br /> Com lete in lace 440 L.P. 4.25 1,870.00 <br />~12. Limestone Parking Lot, 6" <br /> Compacted Thickness • <br />_ including Lime Stabiliza- <br /> tion of Subgrade, Complete 95% of <br /> in lace 4 700 S.Y. 6.81 30,406.65 <br />13. Base Sets, including three <br /> Field Bases and Home Plate, . <br /> as specified on the draw- <br /> in s, Com fete in lace - 0 Each 401.40 - 0 - <br />14. Portable Pitching Mound <br /> as s ecified on drawin s - 0 Each 643.50 - 0 - <br />15. Spectator Bleachers as <br /> specified on drawings, <br /> com lete in lace - 0 Each 741.75 - 0 - <br />16. Asphalt Surface Drive <br /> including lime Stabiliza- <br /> tion of subgrade, 8" <br /> cement stabilized shell <br /> base and 1-1/2 thick <br /> asphalt concrete surface, 95% of <br /> Com lete in lace 580 S.Y. 7.81 4,303.31 <br />17. Break out existing curb <br /> and construct concrete <br /> ramps and curb returns at <br /> 3 locations, including <br /> lime stabilization of <br /> subgrade, Complete in Lump <br /> lace 1 Sum 2,400.00 <br />2,400.00 <br /> <br />18. Project Sign as shown on . <br /> tans, Com lete in lace _ 0 Each 2,112,00 _ 0 _ <br />TOTAL kiORK COMPLETER ~ ` ~~ $730,777.16 <br />L <br /> <br />• ~ - f', '. <br />