My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-10-20 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-10-20 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
7/31/2025 10:33:00 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/20/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,Page:Two - City of La P~e - Construction of Fairmont ~k Recreational Facilities <br />Chatham Construction Comp - Estimate ~~o. 3 <br />' No. Item uantit Unit Unit Price .Total <br />10. Water Service, 2" PVC <br /> Pipe and Tap to main, <br /> Com lete in lace 0 L.F. 1.58 616.20 <br />11. Sanitary Sewer Service, . <br /> 6" PVC Pipe_and Manhole Tap <br /> Com lete in lace 440 L.P. 4.25 1,870.00 <br />~12. Limestone Parking Lot, 6" <br /> Compacted Thickness • <br />_ including Lime Stabiliza- <br /> tion of Subgrade, Complete 95% of <br /> in lace 4 700 S.Y. 6.81 30,406.65 <br />13. Base Sets, including three <br /> Field Bases and Home Plate, . <br /> as specified on the draw- <br /> in s, Com fete in lace - 0 Each 401.40 - 0 - <br />14. Portable Pitching Mound <br /> as s ecified on drawin s - 0 Each 643.50 - 0 - <br />15. Spectator Bleachers as <br /> specified on drawings, <br /> com lete in lace - 0 Each 741.75 - 0 - <br />16. Asphalt Surface Drive <br /> including lime Stabiliza- <br /> tion of subgrade, 8" <br /> cement stabilized shell <br /> base and 1-1/2 thick <br /> asphalt concrete surface, 95% of <br /> Com lete in lace 580 S.Y. 7.81 4,303.31 <br />17. Break out existing curb <br /> and construct concrete <br /> ramps and curb returns at <br /> 3 locations, including <br /> lime stabilization of <br /> subgrade, Complete in Lump <br /> lace 1 Sum 2,400.00 <br />2,400.00 <br /> <br />18. Project Sign as shown on . <br /> tans, Com lete in lace _ 0 Each 2,112,00 _ 0 _ <br />TOTAL kiORK COMPLETER ~ ` ~~ $730,777.16 <br />L <br /> <br />• ~ - f', '. <br />
The URL can be used to link to this page
Your browser does not support the video tag.