My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-11-01 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-11-01 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:24:10 AM
Creation date
7/31/2025 10:33:02 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/1/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUSCH, <br />HUTCHISON <br />& ASSOCIATES, <br />INC. CONSULTING LN OINt[llf <br />1107 ILLLTW000 ORIV[ - <br />DAYTOWN, TLXAS 77820 -- ?MOML 17131 /22-s2111 , <br />ber 28, <br />1976 <br />i <br />ESTIMATE NUMBER: <br />One (1) of <br />Change Order # 1 <br />- <br />PROJECT: <br />City of La Porte - <br />North 16th Street Water <br />Main - Job No. 76-1351 <br />CONTRACTOR: <br />BEN FELTS UTILITY <br />CONTRACTING CO., P. 0. <br />Box 1249, Pearland, Texas 77581 <br />AMOUNT <br />OF CONTRACT: $21,972.07 <br />CONSTRUCTION.TIME: <br />30 Working Days <br />Item <br />No. <br />Item <br />Quantity.Unit <br />Unit Price <br />Total <br />1. <br />8" Class 150 Asbestos -Cement <br />Water Line, Open Trench Con- <br />900 <br />6.66 <br />5,994.00 <br />struction, Complete in place <br />1,740 <br />L.F. <br />5.86 <br />10,196.40 <br />2. <br />8" Class 150 Asbestos -Cement <br />Water Line, Augered Con- <br />struction, Complete in place <br />78 <br />L:F. <br />19.36 <br />1,510.08 <br />�. <br />6" Class 150 Asbestos -Cement <br />Water Line, Open Trench Con- <br />struction, Complete in place <br />45 <br />L.F. <br />4.40 <br />198.00 <br />4. <br />8" x 8" Tapping Sleeve and <br />Valve w/Valve Box, Complete <br />in place <br />1 <br />Each <br />697.02 <br />697.02 <br />5. <br />8" Gate Valve w/Valve Box, <br />Complete in place <br />2 <br />Each <br />297.60 <br />595.20 <br />6. <br />8" x 6" C. I. Tee, Complete <br />- - <br />in place <br />3 <br />Each <br />116.30 <br />348.90 <br />7. <br />6" Gate Valve w/Valve Box, <br />lComplete <br />in place <br />4 <br />Each <br />231.00 <br />924.00 <br />8. <br />Fire Hydrant, 4' Bury, <br />with "Hydrolok Connector, <br />----Complete <br />in plage <br />2 <br />Each <br />581.32 <br />1,162.64 <br />9. <br />6" Plug, <br />Complete in lace <br />2 <br />Each <br />29.00 <br />58.00 <br />10. <br />8" Plug, <br />Complete in= lace _ - - <br />- 1 <br />Each <br />31.00 <br />31.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.