My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-11-01 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-11-01 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:24:10 AM
Creation date
7/31/2025 10:33:02 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/1/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page Two - City <br />Ben <br />of La Porte <br />Felts Util` <br />- rth 16th <br />OWracting <br />Street <br />Water <br />Mai <br />Co.. -_Job <br />No. <br />76?&50 Estimate .._. <br />tem <br />No. <br />Item <br />Quantity <br />Unit <br />Unit Price <br />Total <br />11. <br />Remove and Replace Flexible <br />Base Pavement with 6" <br />Cement Stabilized Shell <br />Base and 1-1/2" Type "F" <br />Hot Mix Asphaltic Concrete <br />Surface, Complete in lace <br />111 <br />S.Y. <br />22.36 <br />2,481.96 <br />12. <br />Road Shell for Repair of <br />Shoulders, etc. (Delivery <br />Ticket Basis) Complete <br />in place <br />- 0 - <br />C.Y. <br />14.00 <br />- 0 - <br />TOTAL WORK COMPLETED <br />$24,197.20 <br />EXTRA WORK: <br />2" PVC Service Lines across N. 16th Street <br />Cost $453.05 plus 15% $521.00 <br />• Locate and plug existing 8" A.C. Water Main <br />Cost $370.95 plus 15% 426.59 <br />TOTAL EXTRA WORK $947.59 <br />TOTAL WORK COMPLETED PLUS EXTRA -WORK $25,144'.79 <br />Pay 90 % of $ 25,144.79 = $ 22,629.74 <br />Less Previous'Payments = 18 338.47 <br />PAY THIS AMOUNT $ 4,291.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.