Laserfiche WebLink
BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING eNOIN[[Rf <br />1107 FLt[TWOOD DRIV< — NAYTOWN, T[XA6 77520 — PHONK 17131 422-8212 <br />Pober 30, 1976 <br />ESTIMATE NUMBER: Two (2) October 1, 1976, through October 30, 1976 <br />PROJECT: City of La Porte - Sanitary Sewer Line Along South.l6th Street - Job No. 76-1307 <br />CONTRACTOR: McKey Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, TX 77571 <br />AMOUNT OF CONTRACT: $91,676.32 CONSTRUCTION TIME: 90 Working Days <br />Item <br />No. <br />Item <br />Ouantity <br />Unit <br />Unit Price <br />Total <br />1. <br />12" V.C. Sanitary Sewer, <br />R.G. Joints, 8' - 10' Cut, <br />Complete in place <br />300 <br />L.F. <br />10.50 <br />3,150.00 <br />2. <br />12" V.C. Sanitary Sewer, <br />R.G. Joints, 6' - 8' Cut, <br />dek <br />Complete in place <br />830 <br />L.F. <br />8.75 <br />7,262.50 <br />3. <br />12" V.C. Sanitary Sewer, <br />R.G. Joints, 0' - 6' Cut, <br />Complete in place - - <br />500 <br />L.F. <br />8.30 <br />- 4,150.00 <br />4. <br />12" Steel Sanitary Sewer <br />Creek Crossing, as shown on <br />Plans and Specifications, <br />Complete in place <br />_ _40 <br />L.F. <br />30.00 <br />A 200.00- <br />5. <br />12" C.I. Sanitary Sewer <br />Class 22, A1,A4A Specifi- <br />cation C-106, 0' - 6' Cut, <br />as shown on Plans, <br />Complete in lace <br />L.F.18 <br />16.35 <br />294.30 <br />6. <br />10" V.C. Sanitary Sewer, <br />R.G. Joints, 6' - 8' Cut, <br />Complete in lace <br />L.F.9030 <br />F <br />. <br />6,497.00 _ <br />7. <br />10" V.C. Sanitary Sewer, <br />R.G. Joints, 0' - 6' Cut, <br />Complete in place <br />1,350 <br />L.F. <br />7.30 <br />9,855.00 <br />8. <br />10" P.V.C. Sanitary Sewer, <br />R.G. Joints, SDR 35 by <br />Augered Construction, <br />Complete in lace <br />- 0 - <br />L.F. <br />25.00 <br />- 0 - <br />