Laserfiche WebLink
t I ` 3 <br />• <br />BUSCH, HUTCHiSON & ASSOCIATES, INC. CGNSVLTINOtN~1N[E~s <br />1107 FLECTY~000 DNIVC - HAYTO'N N, TEXAS 77570 - PHGNE (71Jj ,22~h 211 <br />~ch 18, 1977 <br />ESTIt~TE NUMBER: Six (6) - February 1, 1977 through March 17, 1977 <br />.PROJECT: City of La Porte - Construction of Fairmont Park Recreational Facilities ~~0 74-115` <br />CQNTRACTOR: Chatham Construction Company, 1309 Jefferson, Baytown, Texas 77520 <br />r <br />AMOUNT OF CONTRACT: $213,869.04 <br />CONSTRUCTION TIME: 120 tilorking Days <br />No. Item uantit Unit Unit Price Tota l <br />1. Concession/Scorekeeper/Rest- <br /> room.Building, including site <br /> preparation, slab, plumbing, <br /> fixtures, toilet partitions, <br /> cahinets, signs, concrete <br /> walk, painting, Complete i~n_ Lump <br /> lace 98% Sum 26,200.00 <br />25 676.00 <br /> <br />2. Ballfields, including 100 <br /> C.Y. infield fill, final <br /> dressing, preparation for <br /> seeding, seeding, concrete <br /> dugout, pads, benches and 4 @ <br /> roofs, Com lete in lace 95% Each 3,557.00 13,516.60 <br /> <br />3. Backstops as shown on the <br /> Drawin ,Com lete in lace 4 Each 1,892.00 7,568.00 <br />4. Ballfield Fence, 6' High, <br /> Com lete in lace 2,350 L,F. 4.30 10 <br />105.00 <br /> _ , <br />5. Ballfield Fence, 10' High, <br /> Com lete in lace 360 L.F, 7.75 2,790.00 <br />6. Ballfield Fence, 15' Nigh, <br /> Com lete in lace 80 L.F. 10.19 815.20 <br />7. Gate, 3', Complete in <br /> lace 9 Each 152.25 1,370.25 <br />8. Gate, 15' Double, Complete <br /> in lace 7 Each 275.73 1,930.11 <br />9. Electrical, including, <br /> wire conduit, fittings, <br /> fixtures, poles, switch- <br /> gear, service to building, <br /> complete in place Lump <br /> BASE BID uartz Li hts 99% Sum 94,080.00 93,139.20 <br />