<br />BUSCH, HUTCHiSON & ASSOCIATES, INC. CGNSVLTINOtN~1N[E~s
<br />1107 FLECTY~000 DNIVC - HAYTO'N N, TEXAS 77570 - PHGNE (71Jj ,22~h 211
<br />~ch 18, 1977
<br />ESTIt~TE NUMBER: Six (6) - February 1, 1977 through March 17, 1977
<br />.PROJECT: City of La Porte - Construction of Fairmont Park Recreational Facilities ~~0 74-115`
<br />CQNTRACTOR: Chatham Construction Company, 1309 Jefferson, Baytown, Texas 77520
<br />r
<br />AMOUNT OF CONTRACT: $213,869.04
<br />CONSTRUCTION TIME: 120 tilorking Days
<br />No. Item uantit Unit Unit Price Tota l
<br />1. Concession/Scorekeeper/Rest-
<br /> room.Building, including site
<br /> preparation, slab, plumbing,
<br /> fixtures, toilet partitions,
<br /> cahinets, signs, concrete
<br /> walk, painting, Complete i~n_ Lump
<br /> lace 98% Sum 26,200.00
<br />25 676.00
<br />
<br />2. Ballfields, including 100
<br /> C.Y. infield fill, final
<br /> dressing, preparation for
<br /> seeding, seeding, concrete
<br /> dugout, pads, benches and 4 @
<br /> roofs, Com lete in lace 95% Each 3,557.00 13,516.60
<br />
<br />3. Backstops as shown on the
<br /> Drawin ,Com lete in lace 4 Each 1,892.00 7,568.00
<br />4. Ballfield Fence, 6' High,
<br /> Com lete in lace 2,350 L,F. 4.30 10
<br />105.00
<br /> _ ,
<br />5. Ballfield Fence, 10' High,
<br /> Com lete in lace 360 L.F, 7.75 2,790.00
<br />6. Ballfield Fence, 15' Nigh,
<br /> Com lete in lace 80 L.F. 10.19 815.20
<br />7. Gate, 3', Complete in
<br /> lace 9 Each 152.25 1,370.25
<br />8. Gate, 15' Double, Complete
<br /> in lace 7 Each 275.73 1,930.11
<br />9. Electrical, including,
<br /> wire conduit, fittings,
<br /> fixtures, poles, switch-
<br /> gear, service to building,
<br /> complete in place Lump
<br /> BASE BID uartz Li hts 99% Sum 94,080.00 93,139.20
<br />
|