My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1977-03-21 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1977
>
1977-03-21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
7/31/2025 10:33:19 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/21/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~Paje `Taro - City of La Pse - Con•,tr;rcLion of Fairm~~nt k Recreational Facilities <br />Chatham Construction Cornp~ - Estimate ilo. 6 <br />~_ <br /> No. Item Quantity , Unit l Unit Price Total <br /> 10. ldater Service, 2" PVC • <br /> Pipe and Tap to main, <br /> Com lete in place 390 L,F, 1.58 616.20 : <br /> 11. Sanitary Sewer Service, <br /> 6" PVC Pipe and Manhole Tap <br /> Complete in Place 440 L.F. 4.25 1,870.00 <br /> <br /> 12. Limestone Parking Lot, 6" <br /> Compacted Thickness <br /> including Lime Stabiliza- <br /> tion of Subgrade, Complete 99% of <br /> in place 4,700 S.Y. 6.81 31,686.93 <br /> <br /> 13. Base Sets, including three <br /> Field Bases and Home Plate, <br /> as specified on the draw- <br /> in s, Com lete in lace - 0 - Each 401.40 - 0 - <br />14. Portable Pitching Mound <br /> as s ecified on drawin s 4 Each 643.50 2,574.00 <br />15. Spectator Bleachers as <br /> specified on drawings, <br /> comalete in lace - 0 - Each .741.75 - 0 -. <br />16. Asphalt Surface Drive <br /> including lime Stabiliza- <br /> tion of Subgrade, 8" <br /> cement stabilized shell <br /> base and 1-1/2 thick <br /> asphalt concrete surface, 95q of ' <br /> Com lete in lace 580 S.Y. 7.81 4,303.31 <br />17. Break out existing curb <br /> and construct concrete <br /> ramps and curb returns at <br /> 3 locations, including <br /> lime stabilization of <br /> Subgrade, Complete in Lump <br /> lace 11 Sum 2,400.00 2,400.00 <br />18. Project Sign as shown on <br /> plans, Complete in lace - 0 - Each 2,112.00 - 0 <br /> T OTAL k'ORK COMPLETED g <br /> MATERIAL ON HAND - <br /> <br />• Spectator Bleachers @ Invoice Price '4,04 0.00 <br /> TOTAL WORK COMPLETED PLUS M~gTER IAL ON NAND $204,400.80 <br />.• <br />
The URL can be used to link to this page
Your browser does not support the video tag.