<br />BUSCH, HUTCHISON & ASSOCIATES, 1NC. CONSULTINO[NOINE[R!
<br />- 1107 FLEETWOOD DRIVE - DAYTOWN. TLXA9 77620 - PNONE (713) 422.8213
<br />~y 3, 1977
<br />ESTIMAT~ NUh16ER: Seven (7) - March 18, 1977 through April 30, 1977
<br />PROJECT: City of La Porte - Construction of Fairmont Park Recreational Facilities do 74-115'
<br />CQNTRACTOR: Chatham Construction Company, 1309 Jefferson, Baytown, Texas 77520
<br />AMOUNT OF CONTRACT: $213,869.04
<br />CONSTRUCTION TIi;E: 120 Working Days
<br />No. Item uantit I Uni.t Unit Price ~ Total
<br />
<br />1. i
<br />Concession/Scorekeeper/Rest-
<br /> room Bui.lding, including site
<br /> preparation, slab, plumbing,
<br /> fixtures, toilet partitions,
<br /> cabinets, s19ns, concrete
<br />. - c~ralk, painting, Complete 11n All Lump 26
<br />200
<br />00 26,200.00
<br /> lace Sum ,
<br />.
<br />2. Ballfields, t'ncluding 100
<br /> C.Y. 1~field fill, final
<br /> dressing, preparation for
<br /> seeding, seeding, concrete
<br /> dugout, pads, benches and
<br /> roofs, Com lete in lace 4 Each ~ 3,557.00 14,228.00
<br />
<br />3.
<br />Backstops as shown on the t
<br />'
<br /> Drawin ,Com lete in lace 4 Each 1,892.OG ! 7,568.00
<br />4. Ballfield Fence, 6' High, '
<br /> Com lete in lace 2,350 L.F. 4.30 10,105.00
<br />5. Ballfield Fence, 10' High,
<br />
<br />Com lete in lace
<br />360
<br />L.F. 7,75 2,790.00
<br />6. Ballfield Fence, 15' Hi h,
<br />g
<br />~ {
<br />
<br />Complete in lace 80
<br />L.F. 10.19 815.20
<br />7. Gate,-3', Complete in - ~
<br /> lace I 12 Each 152.25 1,827.00
<br />8. Gate, 15' Double, Complete
<br /> in lace ~ 8 Each 275.73 2,205.84
<br />9. Electrical, including, !
<br /> wire conduit, fittings,
<br /> fixtures, poles, switch- •
<br /> gear, service to building,
<br /> complete in place Lump
<br /> BASE BID uartz Li hts All Sum 94,080.00 94,080.00
<br />
|