Laserfiche WebLink
I <br />BUSCH, HUTCHISON & ASSOCIATES, 1NC. CONSULTINO[NOINE[R! <br />- 1107 FLEETWOOD DRIVE - DAYTOWN. TLXA9 77620 - PNONE (713) 422.8213 <br />~y 3, 1977 <br />ESTIMAT~ NUh16ER: Seven (7) - March 18, 1977 through April 30, 1977 <br />PROJECT: City of La Porte - Construction of Fairmont Park Recreational Facilities do 74-115' <br />CQNTRACTOR: Chatham Construction Company, 1309 Jefferson, Baytown, Texas 77520 <br />AMOUNT OF CONTRACT: $213,869.04 <br />CONSTRUCTION TIi;E: 120 Working Days <br />No. Item uantit I Uni.t Unit Price ~ Total <br /> <br />1. i <br />Concession/Scorekeeper/Rest- <br /> room Bui.lding, including site <br /> preparation, slab, plumbing, <br /> fixtures, toilet partitions, <br /> cabinets, s19ns, concrete <br />. - c~ralk, painting, Complete 11n All Lump 26 <br />200 <br />00 26,200.00 <br /> lace Sum , <br />. <br />2. Ballfields, t'ncluding 100 <br /> C.Y. 1~field fill, final <br /> dressing, preparation for <br /> seeding, seeding, concrete <br /> dugout, pads, benches and <br /> roofs, Com lete in lace 4 Each ~ 3,557.00 14,228.00 <br /> <br />3. <br />Backstops as shown on the t <br />' <br /> Drawin ,Com lete in lace 4 Each 1,892.OG ! 7,568.00 <br />4. Ballfield Fence, 6' High, ' <br /> Com lete in lace 2,350 L.F. 4.30 10,105.00 <br />5. Ballfield Fence, 10' High, <br /> <br />Com lete in lace <br />360 <br />L.F. 7,75 2,790.00 <br />6. Ballfield Fence, 15' Hi h, <br />g <br />~ { <br /> <br />Complete in lace 80 <br />L.F. 10.19 815.20 <br />7. Gate,-3', Complete in - ~ <br /> lace I 12 Each 152.25 1,827.00 <br />8. Gate, 15' Double, Complete <br /> in lace ~ 8 Each 275.73 2,205.84 <br />9. Electrical, including, ! <br /> wire conduit, fittings, <br /> fixtures, poles, switch- • <br /> gear, service to building, <br /> complete in place Lump <br /> BASE BID uartz Li hts All Sum 94,080.00 94,080.00 <br />