My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1977-05-16 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1977
>
1977-05-16 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:53 PM
Creation date
7/31/2025 10:33:26 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/16/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page Two - City of La Poe - Construction of Fairmont ~ Recreational Facilities <br />Chatham Construction Company - Estimate fJo. 7 <br />No. Item ~ uantit Unit Unit Price Total <br />10. Water Service, 2" PVC <br /> Pipe and Tap to main, <br /> Com lete in lace 390 L.F, 1.58 616.20 <br />11. Sanitary Sewer Service, <br /> 6" PVC Pipe and Manhole Tap <br /> Com bete in lace 440 L.p. 4.25 1,870.00 <br />12. Limestone Parking Lot, 6" <br /> Compacted Thickness <br /> including Lime Stabilize- <br />. tion of Subgrade, Complete <br /> in lace 4,458 S.Y. 6.81 30,358.98 <br />13. Base Sets, including three I <br />rzeld Bases and Home Plate, <br />as specified on~the draw- ' <br />in s, Com lete in lace 5 Each 401.40 I 2,007.00 <br /> <br />~ :4.~ Portable Pitching Mound E <br />as s ecified on drawin s 4 Each , 643.50 2,574.00 <br />.5. spectator Bleachers as <br />specified on drawings, <br />com lete in lace 8 Each 741.75 5,934.00 <br />16.i Asphalt Surface Drive <br />including lime stabilize- <br /> <br />~ tion of subgrade, 8" ' <br /> <br />cement stabilized shell ; <br />~ <br />~ base and l-1/2 thick j <br />. ~ asphalt concrete surface, <br />Com lete in lace 588 S.Y. 7.81 4,592.28 <br />I <br />17. ~ Break. out exi sting-curb - - -- <br />- <br />and construct concrete <br />~ ~ ramps and curb returns at <br />~ 3 locations, including <br />~ lime stabilization of <br />subgrade, Complete in Lump ; <br />lace ~ - A1] Sum 2,400.00 2,400.00 <br /> <br />18. <br />Project Sign as 'shown on <br />~ t <br />~ <br /> fans Com lete in lace 90% of 1 Each 2,112.00 1,900.80 <br />TOTAL WORK COM,PLE?ED $212,072.30 <br /> <br />EXT WO K , <br />S~n~ - 1056 C.Y. @ $3.00/C.Y. $ 3,168.00 <br />~~ Asphalt - 4,458 S. r. @ $2.55~S.Y. .11,367.90 <br />TOTAL EXTRA WORK <br />$14,536.90 <br />TOTAL EXTRA WORK PLUS TOTAL WORK COMPLETED $226,608.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.