~-•--,
<br />• •
<br />BUSCH, E-~UTCHiSON & ASSOCIATES, INC, CONSULTING ENCiNEER4
<br />7107 FLEETWGOO DRIVE - ©AYTOW N. TEXAS 77!+20 - i'MONE (713) 422~A 2t3
<br />~ne 30, 1977
<br />ESTI^"SATE NU~1BER: Final - ~ J
<br />` PROdECT• City of La Porte - Constructien of Fairmont Park Recreational Facilities -tob 74-115
<br />CQNTRACTOR:~~ Chatham Construction Com~ar,y, 1309 Jefferson, Baytown, Texas 77520
<br />~riOUNT OF COP~TRACT: X213,869.04 CONSTRUCTION TIME: 120 Llorking Days
<br />1
<br /> i
<br />~No. f Item ~ ~ ~~antit• tUni.t Unit Price Total
<br />1. ~ Concession/Scorekeeper/Rest-
<br />
<br />rcon; Bui,lding, Including site _
<br /> preparation, slab, plumbing,
<br /> ~lxtures, tenet partitions,
<br /> cabinets, signs, concrete
<br /> ~~a7k, nai.nting, Complete fin
<br />~ Lu-;p
<br />
<br />place
<br />,~li
<br />Sum 26,200.00
<br />26,200.00
<br />2, Ballfields, including 100
<br /> C.Y. Infield fill, final
<br /> dressing, preparation fior
<br /> seeding, seeding, concrete
<br /> dugout, pads, benches and
<br /> roofs, Co;r,~lete in lace 4 Each 1 3,557.00 14,228.00 ~
<br />~ 3. Backstops as sho,,;n on the
<br />i Dra~~n n CoT1 7 ete i n 1 ace ~ 4 E?ch 1 ,892.00 7, 568, 00
<br />4. Ba1lTieid Fence, 6' High,
<br /> Complete in lace 2,=,~y ;L.r. 4.30 11 046.70
<br />5. Bal7field Fence, 70' High,
<br /> Ccm lete in place 35~ ~~.F. 7.75 2,751.25
<br />6. Eallfield Fence, 15' Hi h,
<br />g ~
<br /> ~.+
<br />~ ~
<br />Comol~7.e in lace ~ ~~ :L., . 10.19 ~
<br />S15.~0
<br />7. Gate, 3', Complete in
<br />~
<br />
<br />~ a
<br />1 ce iS "= -~
<br />__a~n 152.25
<br />2,233.75
<br />8. Gate, 15' Double, Complete
<br /> --~
<br />in ~~ace _~;.n 275.73
<br />2,205.84
<br />9. Electrical, including, ~ _
<br /> !,~i re co::dui t, fittings ,
<br /> fixtures, poles, sti~;itch-
<br /> gear, service to building, ~
<br />~
<br /> coma i ete i n Mace
<br />, p =.~~ ~
<br /> BASE BID uartz Li hts ~ ~'~ ~S:.r~ 94,080.00 v J
<br />94,080.00
<br />
|