My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1977-06-20 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1977
>
1977-06-20 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:53 PM
Creation date
7/31/2025 10:33:31 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. , ~ ..; _ <br />~~e Two - City of La P e - Construction of Fairmont ~k Recreational Facilities <br />Chatham Construction Comp - Estimate <br />"~ <br /> No. Item ~ uantit Unit1 Unit Prlce Total <br /> 10. Water Service, 2" PVC <br /> Pipe and Tap to main, <br /> <br />Com lete in lace ~ 390 L.F. 1.58 616.20 <br /> 11. Sanitary Sewer Service, _ <br /> 6" PVC Pipe_and ~~anhole Tap. <br /> <br />Com lete in lace i ~ <br />cc0 <br />L.F. <br />4.25 <br />1,870.00 <br /> ,12. Limestone Parking Lot, 6" <br /> Compacted Thickness: <br /> including Lime Stabi7iza- <br /> lion of Subgrade, Complete. <br /> in lace ~ 4,458 S.Y. 6.81 30,358.98 <br /> 13. Base Sets, including three <br /> Field Bases ar,d home Plate, <br /> as specified on the draw- i <br /> in s, Com lete in lace. f 5 : Each 401.40 2,007.00 <br /> 14. Portable Pitching Mound <br /> <br />, as specified on drawin s <br />4 ; ~- <br />teach, l <br />643.50 <br />2,574.00 <br /> 15. ~ Spectator Bleachers as <br /> ! specified on drawings, I <br /> I complete in lace $ Each = 741.75 5,934.00 <br /> <br />16. <br />i P.sphal t Surface Drive <br />~ ~ <br />j <br /> including lime stab~l~za- ~ <br /> lion of Subgrade, 8" <br /> cement stabilized shell ` j <br /> base and 1-1/2 thick ~ ~ <br /> f asphalt concrete surface, ~ <br /> s Complete in lace ~ ~:~ S.Y.# 7.81 4,592.28 <br /> 17.E Break out existing curb ~ . <br /> and construct concrete <br /> ramps and curb returns at <br /> 3 locations, including <br /> lime stabilization of <br /> subgrade, Complete in Luyp <br /> lace n7~ Sum ; 2,400.00 2,400.00 <br /> 18. Project Sign as shotrm on { <br /> lans, Com lete in lace ~ Each 2,112.00 2,112.00 <br />TOTAL trORK COMPLETED <br />1 <br />5213,643.?0 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.