My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1977-11-07 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1977
>
1977-11-07 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:53 PM
Creation date
7/31/2025 10:33:45 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/7/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• A <br />U <br />IZLSOLtJ ~ IOiQ <br />A RTS~LU`I'IOi~T AUT;-IOR:L"ZIl~TG ''i'iiL CI'~5' OF l:.A F'OItTL, TEXAS, TO ACT <br />AS AG];'.iQ'T' r'OR 13A1'SI3OI2~ DILJNICIPAL UT:CL:CT1' D:CSTRIC`1' IiV AIQ APPLI- <br />CA`.l'ION FORA I'EDERAL' COPTSTRUCTIOi1 GRAIJT UNDER TIIE FEDERAL <br />COiVS']'RUC`.t'IO,V PROGRAM OF LP A LA6V NUPdL'EL? 92-500 AiVD APPROPRIE\'I'T_I~'G <br />SUFFICIE't~T`i' FUI~IDS TO Ri::IMI3URS:e~ THE CITY OF LA POR`1~E FOR COSTS <br />EXPEiVDED 13Y THE CITY FOR T7-IIS PURPOSJ~. <br />%VTIEI~AS, IIayshore Municipal Utility District- must improve <br />its s~caage collection a.nd make .long range arrangements for <br />the treatment of sewacJe; and <br />WFTrREA5, the City of La Porte has made an application for <br />a Federal Construction Grant under EPA Public Laca ',.lumbe:r 9l- <br />• 500 for the City of La Porte and is willing to amend its appli- <br />cation to include ]3ay:~ho~:•~~ Municipal ~Utili_ty District i.n this <br />project, the successful comple-tbi.on of a joint fac:Ll:Lty being <br />conditioned upon tine occurrence of cer~tair~ contingencies which <br />wi1]_ lae described hereinafter; and <br />WI3EFtT:AS, it will be necessary for Bayshore Municipal Utility <br />District to reimburse the City of La Porte for. any casts expended <br />by said City as a result of this amended application; and <br />GVliti~;REAS, each such application must be processed in three <br />steps, the first step of which is a study and prepara•l-ion of <br />prelirniriary plans and an analysis of the cxis~ting facility, <br />the initial phase of which is an infiltration infloca analysis <br />• of .•thE existing sewage: collection system, followed by a sanitary <br />sewer evaluation survey if the original analys:i_s justifies <br />SUCH ~ survey and thirdly the preparation of a facility plan <br />describing how to solve the problem and what.to.build, thereby <br />crxdinc~ step l; the second step of which 5.s the preparation <br />of the p]_ans and specifications and the third step of cahich <br />i.s the; construction phase; anti <br />i~3HliFtEAS, tine magni.tud~ oL- i:Iie La Pui:ce: project causes it <br />• <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.