My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1980-03-19 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1980
>
1980-03-19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:55 PM
Creation date
7/31/2025 10:35:22 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/19/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t. <br />AGREEMENT <br />• BETWEEN <br />OWNER AND ENGINEER <br />FO R <br />PROFESSIONAL SERVICES <br />THIS AGREEMENT made as of day of <br />• <br />1980, by and between the CITY OF LA PORTE, -TEXAS (hereinafter <br />called the OWNER) and O'D'IALLEY AND CLAY, INC., (hereinafter <br />called the ENGINEER, WITNESSETH, that whereas the OWNER intends <br />to have a DRAINAGE STUDY made of the CITY OF LA PORTE in <br />accordance with the BASE PROPOSAL submitted by the ENGINEER <br />dated January 19 80 , and INTERNATIONAL AERIAL MAPPING COMPANY' s <br />proposal to the ENGINEER dated January 10, 1980, both made a <br />part of this agreement. <br />NOW THEREFORE, the OWNER and the ENGINEER in consideration <br />• of their mutual covenants herein agree in respect of the <br />performance of professional engineering services by the ENGINEER <br />and the payment for those services by the OWNER, as set forth <br />below. <br />SERVICES OF THE ENGINEER <br />GENERAL <br />The ENGINEER will perform the ENGINEERING SERVICES including <br />Field Surveys and Control, Aerial Photography and Mapping, Study <br />Preparation and FINAL DRAINAGE STUDY REPORT as set forth herein. <br />The various operations and development of the STUDY will <br />be accomplished in accordance with the ENGINEER'S BASE PROPOSAL <br />dated January 19 80 , and the INTERNATIONAL AERIAL DIAPPING <br />COMPANY'S PROPOSAL dated January 10 , 19 80 . <br />COMPENSATION <br />For preparing the DRAINAGE STUDY as set forth above, the <br />OWNER agrees to pay the ENGINEER a professional engineering fee <br />in the amount of FORTY FIVE THOUS AND SEVEN HUNDRED DOLLARS <br />($45,700.00) . <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.