Laserfiche WebLink
• <br />L~ <br /> <br />1980 WATER IMPROVEMENT BOND FUND <br />• <br />TOTAL BONDS: <br />ESTIMATED EXPENDITURES <br />1. Bond Fees <br />2. Right of Way Expenses <br />3. Engineering Design Fee <br />4. Extra Services <br />5. Contingency <br />6. Construction Contract <br />$280,000.00 <br />8,541.05 <br />8,114.00 <br />16,415.29 <br />11,000.00 <br />11,168.71 <br />224,760.95 <br />$280,000.00 <br /> <br />