Laserfiche WebLink
• ~ } + . • <br />F~ CARtOS SMITH <br />ENGINEERS AND SURVEYORS, INC. <br />718 S. Broadway <br />P.O. Box M <br />La Porte, Texas 77571 <br />(71 31 471-4226 <br />DATE: JANUARY 14,1981 <br />Honorable Mayor and City Council <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77571 <br />Gentlemen; <br />Forwarded herewith is a tabulation of the bids on the 12" Water Line Extensions, <br />Lomax Bond Program, Job No. 1287-80, which were recieved on January 7,1981 at 7:00 P. M. <br />There were ten sets of plans and specifications given out to bidders and <br />nine bids were recieved. <br />The three low bidders, in order, for the Base Bid using P.V.C. Pipe are; <br />PASTEX CONSTRUCTION COMPANY,INC. $ 237,137.00 <br />BILL McDONALD CONSTRUCTION, INC. $ 247,683.50 <br />DAVID WIGHT CONSTRUCTION COMPANY, iNC. $ 254,728.10 <br />For Additional Construction Base Bid, they are; <br />BILL McDONALD CONSTRUCTION, INC. $ 40,741.50 <br />DAVID WIGHT CONSTRUCTION COMPANY, INC. $ 46,393.65 <br />PASTEX CONSTRUCTION COMPANY, INC. $ 46,970.35 <br />The Total low Base Bid for P.V.C. Pipe is; <br />PASTEX CONSTRUCTION COMPANY, INC. $ 284,107.35 <br />The three low bidders, in order, for the Alternate Bid using A-C Pipe are; <br />McKEY CONSTRUCTION & EQUIPMENT,INC. $ 212,139.55 <br />PASTEX CONSTRUCTION COMPANY, INC. $ 213,089.11 <br />BILL McDONALD CONSTRUCTION, INC. $ 223,666.00 <br />For the Additional Construction Alternate Bid, they are; <br />BILL McDONALD CONSTRUCTION ,INC. $ 37,044.00 <br />McKEY CONSTRUCTION & EQUIPMENT, INC. $ 40,403.00 <br />DAVID WIGHT CONSTRUCTION COMPANY, INC. $ 42,378.00 <br />The total low bid for the Alternate of A-C Pipe is; <br />McKEY CONSTRUCTION & EQUIPMENT, INC. $ 252,542.55 <br /> <br />Page 1 of 2 <br />