My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1982-08-18 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1982
>
1982-08-18 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:56 PM
Creation date
7/31/2025 10:36:56 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
., <br /> <br /> <br /> <br />RE6~UEST FOR PROPOSAL <br />• <br />DATA PROCESSTPIG SYSTEM <br />I. INTRODUCTION <br />A. The City of La Porte is making a call for proposals to perform <br />a Comprehensive study of the present and future needs for a.Data <br />Processing System. <br />B. Each proposal must be legibly printed in ink or by typewriter, <br />include the full name and business address of the contractor, <br />and be signed in ink by the contractor. A proposal by a firm <br />or organization other than a corporation must include the name <br />and address of each member. A proposal by a corporation must <br />be signed in the name of such corporation by a duly authorized <br />official thereof. Any person signing a proposal for a firm, <br />corporation, or other organization unit should show evidence <br />of his/her authority to so bind such firm, corporation, or or- <br />ganization. <br />C. Unless otherwise provided for, final payment shall''be made by':the <br />City within thirty (3p} days after the project completion. Con- <br />sultant shall submit a payment schedule. <br />• D. Prior to submitting a proposal, the contractor may, in order to <br />accurately access the services to be rendered and to determine <br />the status of existing management and operations procedures, <br />make preliminary on-site visits. The contact person will be <br />Mr. Jack Owen, City Manager, La Porte. <br />E. The City estimates that the services called for will be provided <br />over an elapsed time period of, no more than 90 calendar days, <br />after the execution of the contract. Cost will not be the sole <br />selection criteria for the acceptance or rejection of any <br />proposal. For this assignment, the City has appropriated a budget <br />of TWF,NTX THOUSAND DOLLARS (20,000.00) that may not be exceeded. <br />The actual fee, however, shall be based on negotiations following a <br />review of the detailed work effort proposed by the consultant. <br />F. The proposal will be accepted at; City of La Porte, City Hall Building <br />(604 W. Fairmont), until August 9, at 5:00 P.M. <br />1. An original and eight (8) copies of the proposal. <br />2. An explanation of the project management approach to be <br />used, to.include specification of project tasks to be <br />performed. <br />3. Specification~.of. the amount of on-site time to be devoted to <br />the project, by person. <br />• 4. A detailed work plan for the assistance to be provided, inclu- <br />ding time schedule. <br />.1' I • <br />
The URL can be used to link to this page
Your browser does not support the video tag.