Laserfiche WebLink
• • <br />• Task 2.2 - Population Demographics <br />Present and future population densities and land use will be <br />presented for each subarea. This information will result in an <br />estimate of equivalent population per subarea for each milestone <br />year. <br />Task 2.3 - Water System Demands <br />A determination establishing current water usage by user <br />class will provide design criteria for the future water use <br />projections over the planning period. Engineers will compare <br />the demands established by this analysis to other demand <br />criteria utilized in .the Texas Gulf Coast area and recommended <br />criteria for this study. <br />Task 2.4 - Water System Capacities <br />• Utilizin the rojected systemwide water demands, engineers <br />9 P <br />will prepare preliminary capacities of supply facilities required <br />to serve these demands. Required unit capacities for raw water <br />supply and treatment, booster pur:~page, and ground and elevated <br />storage capacities will be prepared. Unit capacities will be <br />determined based on the water consumption requirements for each <br />milestone year. <br />Task 2.5 - Client Review <br />The information collected, criteria established, and projec- <br />tions made will be presented to the Board in a Technical Review <br />Meeting. The data and information will be presented in graphs, <br />tables, and exhibits. No formal report is proposed, but minutes <br />• of the meeting will be prepared and distributed. <br />Task 3.0 - Water System Analysis <br />Following establishment of final land-use projections and demand <br />criteria, Engineer will prepare final systemwide demands. A computer- <br />ized model of the water system will be utilized to determine the <br />conveyance capability of the existing distribution network and <br />required improvements for each milestone year. The model, titled <br />UKNET, developed by the University of Kentucky, will be used. The <br />• <br />0 <br />~/.~ <br />