Laserfiche WebLink
• <br />LlA2E OF N~'rII~iG: (Next ) <br />AGENLIA TTFI~i: Water Well #5 ( 25th Street ) <br />ORIGINATED BY: Jerry L. Hodge, Director of Public Works <br />PRUTF~CT SUMMARY: Extraction of downhole column shaft and replacement. of shaft bearings <br />as needed, and check downhole turbine pump and bowls and repair/replace <br />as needed. <br />FISCAL SUMMARY; Expected to last ten (10) years. Approximate cost of $12,000.00. <br />Funds required from water contingency fund. <br />ACTION Council vote <br />• <br />ALTERNATIVES: Without repair the bearings will seize and cause extensive and more <br />expensive damage to the downhole pumps 'and shaft. <br />RECQ~TION: Permit Layne Texas Water Well Company to complete the work needed prior <br />to summer water demand. ' <br />EXHIBITS: Memo from Water/Wastewater Superintendent. <br />$[J$,MjZ~; Jerry L. Hodge <br />• <br />