Laserfiche WebLink
• <br /> <br />• <br />• <br />TO: Jerry L. Hodge, Director of Public Works DATE.: March 16, 1983 <br />FROM: Luther Maxey, Water/Wastewater Superintendent <br />SUBJECT: Well No. 5 (25th Street) <br />On Thursday, March 3,...1983, Larry Behrens along with his Fuld Engineer from. <br />Layne Texas Water Well Service, checked well #5. <br />Qur observation was .excess- shaft wobble:due:to.thrust bear~ng,glay. According <br />to Layne Texas representatives, there are downhole bearings, beginning to go <br />out, as well as, the surface thrust bearing. Their consensus was that the <br />bearing failure is due to normal wear. <br />The Labor cost to pull the column shaft from downhole.would be EIGHT THQUSAND <br />DOLLARS. ($8,000.00). Parts cost is unknown, as each bearing and pump stage <br />will have to be checked as it is extracted from the well casing. An average <br />cost would be FOUR THOUSAND DOLLARS ($k,O00.00), thus making the. total estimated <br />cost of the job TWELVE THOUSAND DOLLARS ($12,000.00). <br />If you should have any questions, please advise. <br />LM/lw <br /> <br />