My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-04-06 Regular Meeting La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-04-06 Regular Meeting La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
7/31/2025 10:37:35 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/6/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> <br />• <br />• <br />TO: Jerry L. Hodge, Director of Public Works DATE.: March 16, 1983 <br />FROM: Luther Maxey, Water/Wastewater Superintendent <br />SUBJECT: Well No. 5 (25th Street) <br />On Thursday, March 3,...1983, Larry Behrens along with his Fuld Engineer from. <br />Layne Texas Water Well Service, checked well #5. <br />Qur observation was .excess- shaft wobble:due:to.thrust bear~ng,glay. According <br />to Layne Texas representatives, there are downhole bearings, beginning to go <br />out, as well as, the surface thrust bearing. Their consensus was that the <br />bearing failure is due to normal wear. <br />The Labor cost to pull the column shaft from downhole.would be EIGHT THQUSAND <br />DOLLARS. ($8,000.00). Parts cost is unknown, as each bearing and pump stage <br />will have to be checked as it is extracted from the well casing. An average <br />cost would be FOUR THOUSAND DOLLARS ($k,O00.00), thus making the. total estimated <br />cost of the job TWELVE THOUSAND DOLLARS ($12,000.00). <br />If you should have any questions, please advise. <br />LM/lw <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.