Laserfiche WebLink
H. CARLOS SMITH <br />ENGINEERS AND SURVEYORS. INC. <br />718 SOUTH BROADWAY <br />• P. O. BOX M <br />LAPORTE.TEXAS 77571 <br />8 April, 1983 <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, Texas 77571 <br />Attn: Mr. Jerry Hodge <br />Director of Public Works <br />Dear Jerry: <br />PHONE A/C 713 471-4226 <br />Re: Street Paving & <br />Drainage Improvements <br />Job No. 1565-82 <br />In reply to your request, we have estimated the cost of <br />the improvement of Monument Road, as per the specifications <br />of the contract on the above referenced job with McKay <br />Construction & Equipment, Inc. We estimate the cost, <br />including engineering at $51,500.00. We would have to <br />be authorized to prepare the plans as soon as possible <br />to be able to add this to the contract. <br />For the preparation of the subgrage and lime stabilization <br />• of the subgrade on Deaf Smith Road and Santa Anna Lane, <br />we have been advised by McKay Construction that an additional <br />$0.36 per square yard would be necessary for the preparation <br />of the subgrade, with the unit price as bid for the lime <br />stabilization of $1.92 per square yard to apply for this <br />item. It is estimated that the costs would be: <br />Deaf Smith Road $ 15,200.00 <br />Santa Anna Lane 7,600.00 <br />The total for all three of these additions would be $74,300.00, <br />based on estimated quantities. <br />This is some what less than 20% of McKey's total bid of <br />$405,610.73, and would be within the provisions of the <br />contract. <br />Please advise us as soon as possible if this is approved, and <br />get us a letter of authorization so that we may prepare the <br />plans as quickly as possible. <br />Very truly yours, <br />H. Carlos Sm}th - <br />H. Carlos Smith, <br />President <br />Engineers & Surveyors, Inc. <br />2~~ fl <br />~~ <br />P.E. <br />t~ ~ <br />