My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-04-20 Public Hearing and Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-04-20 Public Hearing and Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:58 PM
Creation date
7/31/2025 10:37:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/20/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V <br />} . 1 • <br />CI'PY OF LA PORTE <br />INTER-OFFICE MEMORANDUM <br />T0: Ja wen, 't' anager DATE: April 11, 1983 <br />FROM: J JHod e irector of Public Works <br />SUBJECT: L ax r e Improvement Project <br />The City of La Porte has awarded the contract for street improvements <br />in the Lomax area to McKey Construction for the bid price of FOUR <br />HUNDRED FIVE THOUSAND SIX HUNDRED TEN DOLLARS AND SEVENTY THREE CENTS <br />($x+05,610.73). Pre-bid estimates by H. Carlos Smith Engineers and <br />Surveyors amounted to FIVE HUNDRED THOUSAND ($500,000). <br />Mobile/Pasadena Chemical Corporation, in joint venture with BWF Contractors, <br />has proposed an experimental street project, using a by-product as base <br />material, for two (2) additional streets in the area of the street project <br />awarded to McKey Construction. The City is to prepare subgrade and apply <br />paving surface. <br />• This would leave Monument Drive, a street located in the same subdivision, <br />unpaved. Because budgeted amount for contract paving equaled the engineer's <br />estimate, Monument Drive was left off the contract. <br />The City requested H. Carlos Smith Engineers. and Surveyors to estimate the <br />cost of including Monument Drive in the project. Estimated cost, including <br />engineering, is FIFTY ONE THOUSAND FIVE HUNDRED DOLLARS ($51,500), using <br />unit prices bid by McKey Construction. <br />The experimental .project requires the City to furnish lime stabilization of <br />subgrade. Because of rain and .weather related delays, the Street Division <br />is behind in planned street construction. The City .requested H. Carlos Smith <br />to contact McKey Construction regarding adding subgrade preparation of Deaf <br />Smith and Santa Anna to the Lomax Paving Project. <br />Because the entire construction was not requested, McKey Construction advised <br />that an additional THIRTY SIX CENTS ($0.36) per square yard of the unit price <br />bid would be required. Estimated cost to prepared subgrade for Deaf Smith <br />and Santa Anna would be TWENTY TWO THOUSAND EIGHT HUNDRED DOLLARS ($22,800). <br />Total estimated cost to add Monument to the street construction project, <br />along with subgrade preparation of Deaf Smith and Santa Anna would be <br />SEVENTY FOUR THOUSAND THREE HUNDRED DOLLARS ($7,300). This would be less <br />than 20% of McKey's total bid of FOUR HUNDRED FIVE THOUSAND SIX HUNDRED TEN <br />DOLLARS AND SEVENTY THREE CENTS ($x+05,610.73), and would be within the <br />• provisions of the contract, and within the FIVE HUNDRED THOUSAND DOLLARS <br />($500,000) budgeted for contract street improvement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.