My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-03-14 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-03-14 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/14/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
..' • ~5 • <br />~ ~ 12.0 Isolation Valves: <br />~ There rill be manual isolation valves located at the origin of the <br />• pipeline supply •nd •t each customer use point. The compressors feeding the <br />pipeline supply system are equipped with automatic trip/isolation controls and <br />valves. <br />13.0 Pipeline Markers: <br />Line markers will be installed at all major direction changes, and all <br />casing vent a, at nominal 1000 ft. intervals on straight runs of pipe, and on <br />cathodic test stations to fully identify the routing and location of the <br />installed line. Pipeline markers will specify the following: <br />Union Carbide Corp. - Linde Division <br />Service of Pipeline <br />Phone number for Linde contact in emergency <br />• <br />i• <br />
The URL can be used to link to this page
Your browser does not support the video tag.