My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-05-02 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-05-02 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:58 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/2/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• ~~ • <br />w~1 <br />CITY OF LA PORTE <br />INTER-OFFICE i•4EMORANDUM <br />T0: Jerry Hodge, Direc ror of Public Works DATE: April 21, 198 <br />i / <br />FROM: Luther Maxey, s 's. Director of Public Works <br />SUBJECT: Replacement of the wall located at i+01 South First Street. <br />During replacement of the sewer main in the alley easement behind <br />~+Ol South First Street the clay the fence was destroyed. The sewer <br />main was one (1) foot east and ten (10) foot deep beneath the fence. <br />Also, the sewer main had to be relaid in the same trench due to <br />other utilities in the easement, such as underground telephone, 1+ <br />inch gas main and a 4 inch water main. <br />The excavation was solid shored with oak boards and hydraulic Speed <br />Shore equipment, however, the wall type fence could not.be`.lield. <br />A temporary fence has been placed to secure a dog belonging to the <br />resident. It should be noted that the resident has been most patient <br />and understanding in this situation, but the City is obligated to <br />replace the fence. <br />Attached is a copy of a memo from Jackson Ray showing a potential <br />cost of SEVEN THOUSAND ONE HUNDRED TWEATTY DOLLARS ($7,120.00) to <br />complete the work, less the cost of the concrete footing. The footing <br />can be constructed by City crews with an estimated cost of ONE THOUSAND <br />THREE HUNDRED FIF'T'Y DOLLARS ($1,350.00) for forms, rebar, and concrete. <br />Please ask for EIGHT THOUSAND FIVE HUNDRED DOLLARS ($8,500.00) from <br />water/wastewater contingency fund ~acc~ount #003-810-810=000 and <br />permission to bid this project. Please call if I can be of further <br />assistance. <br />LM/me <br />attachments <br />~~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.