My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-05-02 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-05-02 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:58 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/2/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />• ~ • <br />I <br />INTER-OFFICE MEMORANDUM <br />MARCH 16, 1984 <br />T0: L. MAXEY =`ASSISTANT DIRECTOR OF PUBLIC WORKS <br />i ~ ,~.- <br />FROM: J. RAY:, ~ r' <br />l <br />SUBJECT: REPLAGEM ;~OF TILE WALL - 401 S. FIRST STREET <br />!t// <br />Per your request of March 6, 1984 I have developed the following cost data <br />concerning the the wall removed by city crews for the oversized sewer line <br />being installed in the alley between First St. and Broadway in the 400 block. <br />The wall is 83 linear feet long by 6 feet tall. It is basically constructed of <br />a concrete beam with piers every five feet, the blocks, reinforcing mesh, and <br />mortar. It was originally built in 1953 and has survived to the present day <br />with no modifications. The owner, Bill Jones, indicates he will accept no sub- <br />stitutions in rebuilding this wall. <br />I contacted a total of ten masonry contractors in the Bay Area to obtain quota- <br />tions to rebuild this wall. At the present time I have received two bids on re- <br />placing this structure to its original state. They are as follows; <br />1. B & D Masonry Contractors - 944-5444 - Ken Freytag <br />Material Cost - $3,785 <br />Labor Cost - $6,415 <br />Total Cost - $10,200 <br />2. Myric Masonry - 427-5294 - Mike Myric <br />Material Cost - $3,916 <br />Labor Cost - $3,204 <br />Total Cost - $7,120 <br />Neither quotation includes repouring the beam. Should the beam need to be re- <br />poured the City of La Porte will need to make arrangements to have this done <br />at additional cost. ~~ <br />It is important to note that if Bill Jones could be persuaded to accept a wall <br />constructed of cinder block as a replacement for his existing wall the total <br />job cost could be lowered to the $2500 range. <br />I will continue my efforts to obtain more quotations for comparison purposes. <br />Please advise if you have any further needs on this project. <br />JR/mb <br />.AJ) o d{ <br />
The URL can be used to link to this page
Your browser does not support the video tag.