Laserfiche WebLink
• <br />• <br />• <br /> <br />• r • <br />-~ t_„ ' <br />AttachmQ.nt "B" <br /> <br />Breakdown of Probable Construction Costs <br />A. College View MUD Share <br />21" VCP 22,900 l.f. $ 50 $1,145,000 <br />12" F.M. 6,500 l.f. 25 162,500 <br />Siphons 4 50,000 200,000 <br />Iai.ft Stations 2 140,000 280,000 <br />Subtotal $1,787,500 <br />Contingencies @ 15~ 268,500 <br />Total Trunk Sewer $2,056,000 <br />Main STP F~pansion (including 15g Contingency) 949,000 <br />Total -College View MUD Share $3,005,000 <br />B. City of La Porte Share <br />Total Probable Construction Cost $7,721,000 <br />Total - College View MUD Share 3,005,000 <br />Total - City of La Porte Share $4,716,000 <br />C. S~unaxy <br />College View MUD Share = $3,005,000 = 38.9 <br />City of La Porte Share = $4,716,000 = 61.1 <br />~, <br />• <br /> <br />