My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-06-20 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-06-20 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />.~ <br />• <br />• <br />Attachment "C" <br /> <br />Brealcdawn of F~^~gineering Tasks <br />• <br />1. Special Studies and Reports Phase <br />a. Study of ultimate abandoa~ment of College View wastewater plant <br />b. Study of solids handling at College View wastewater plant <br />c. Preparaticm of ca~liance schedule for College View NIUD waste- <br />water treatment plant <br />d. Preparation of applications for amendments to existing TDWR and <br />NPDES (EPA) permits of main wastewater treatment facility in <br />ccmjunctiari with proposed expansion <br />e. Preparatiari of Engineering Reports. <br />2. Preliminary Design Phase <br />a. Preliminary design of main wastewater treatment facility <br />b. Preliminary design of relief trunk sewer <br />c. Preliminary design of College View NAJD ultimate lift station <br />d. Preparatiari of Preliminary Design Reports <br />• <br />• <br />3. Final Design Phase <br />a. Preparation of constructicm contract for main wastewater treatment <br />faciLi_ty expansion <br />b. Preparation of construction ccmtract for relief trunk sewer and <br />ultimate College View Lift Station <br />c. Design Surveys (Special Services) <br />d. Geotechnical work (Special Services) <br />e. Submission of design to regulatory agencies for approval <br />f. Furnish Plans and Specificatioa~s for bidding purposes. <br />4. Ccrcistruction Phase <br />a. Assist with Advertisement for bids <br />b. ReccQm~end award of contract <br />c. Assist with preparation of formal cca~tract doc~rents <br />d. Perform Basic Services construction phase tasks <br />e. Provide Resident Project Representatives as authorized <br />f. Conduct final inspecticm <br />g. Reca~end final acceptance of constructed projects (s) . <br />(Special Services) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.