Laserfiche WebLink
', <br />.~ <br />. • • <br />• . <br />~lttacl~mnent "D" <br />Analysis of Basic Services ~hgineering Fees <br />-~ <br />Based on Fee Curves <br />• 1. Sanitary Sewer Constructics~ Cost <br />Percent of Ccnstruction Cost frcan Curve B = $4,311,000 <br />= 5.3$ <br /> Fee = $4,311,000 x 0.053 = $228,500 <br />2. Main STP Co~nstructicn Cost ='$3,365,000 <br /> Percent of Constructiari Cost from Curve A = 6.5~ <br /> Additional Cot~ensation for Modifications = 33~ <br /> New Constructioaz = $2,165,000 <br /> Modifications = $1,200,000 <br /> Fee - New Ccrostruction = $2,165,000 x 0.065 = $140,700 <br /> - Modifications = $1,200,000 x 0.065 x 1.33 = 103,800 <br /> - Total $244,500 <br />3. Special Studies and Reports Phase Fee _ $ 12,000 <br />4. Suncnary - Basic Services Fees <br /> Sanitary Bawler $228,500 <br /> Main STP 244,500 <br /> Special Studies and Reports Phase 12,000 <br /> Total $485,000 <br />• <br />• <br />~. <br />