My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-06-20 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-06-20 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />CJ <br /> <br />Robert C. Reach, P.E. <br />Project Manager <br />.. <br />1 • <br />Education Master of Engineering <br />Engineering, 1977. <br />Bachelor of Science in <br />Engineering, 1975. <br />Rensselaer Polytechnic <br />Registration Professional Engineer: <br />Florida, 1980 <br />in Environmental <br />Environmental <br />Institute <br />Texas, .1981; <br />Professional Texas Water Pollution Control Association <br />Affiliations Water Pollution Control Federation <br />Texas Society of Professional Engineers <br />' National Society of Professional Engineers <br />Experience Turner Collie & Braden Inc., Houston, Texas; <br />1980-present, Manager. <br />Responsibilities include project management, <br />supervision and coordination of engineering <br />desiyn groups, water and wastewater treatment <br />facility design, preparation of plans and speci- <br />fications, report writing, preparation of permit <br />applications, project planning and scheduling, <br />construction management. <br />C~ <br />The following is a list of representative <br />projects. <br />City of La Porte Main Sewage Treatment Plant <br />Improvements. Analysis of plant operational <br />problems, evaluation of plant equipment and <br />design, recommendation of improvements includ- <br />ing new sludge pumping system, modification of <br />lift station controls, and control building <br />ventilation. <br />City of Alice Northeast Sewage Treatment Plant. <br />New 2.02-mgd oxidation ditch treatment plant and <br />a new 1.8-mgd lift station. <br />City of Alice Southside Sewage Treatment Plant. <br />Expansion of an existing facility from 2.0 mgd <br />to 2.7 mgd. <br />• <br />TurnerCollie~Bracien Inc. ~ <br />.E /s <br />
The URL can be used to link to this page
Your browser does not support the video tag.