Laserfiche WebLink
• <br />• <br /> <br />Robert C. Reach, P.E. <br />Page Two <br /> <br />Experience Kingwood Place Wastewater Treatment Plant, <br />Kingwood, Texas. New facility with initial <br />capacity of 0.75 mgd, ultimate capacity of <br />3.0 mgd. <br />Beltway Wastewater Treatment Plant Phase III <br />Expansion, Houston, Texas. Expansion of the plant <br />from 4.4-mgd capacity to 13.34-mgd capacity. <br />Responsible for preparation of final plans, speci- <br />fications, and contract documents. <br />Port Acres Wastewater Treatment Plant, Port <br />Arthur, Texas. Expansion of the plant from <br />0.4-mgd capacity to 1.9-mgd capacity. <br />Main Outfall Lift Station, Port Arthur, Texas. <br />Design of a major sewage lift station with <br />38.5-mgd capacity. <br />Gee & Jenson, Inc., West Palm Beach, Florida; <br />1976-1980, Project Engineer. <br />Representative projects include the following. <br />Acme Improvement District Wastewater Treatment <br />Plant, Wellington, Florida. Design of a 1.5-mgd- <br />capacity oxidation ditch-type treatment facility. <br />Wastewater Treatment Plant Rehabilitation, <br />• Deerfield Beach, Florida. Design of modifica- <br />tions and upgrading of a 4.0-mgd-capacity <br />contact-stabilization plant. <br />Wastewater Collection System Expansion, Deerfield <br />Beach, Florida. Design of 10 pump stations and <br />approximately 40 miles of gravity and pressure <br />pipelines to serve developed areas of the city. <br />u <br />TurnerCollie c~Braden Inc <br />l~ <br />